Real Goods Solar

How many solar installs has Real Goods Solar done in California, and which license number is on its installs?

Real Goods Solar has 3,775 residential solar installs interconnected in California, active in the records from 2001 through 2018 (Mar 13, 2001 to Jun 11, 2018), most of them in Fresno County (406), Sonoma County (353) and Santa Clara County (307). The license number recorded on most of its installs, 840934, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,775
Last 24 months
0
Total capacity
20,609.5 kW DC
Median system size
4.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
13.8% of 2,948 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 341, lease 39, other 27
First install
Mar 13, 2001
Latest install
Jun 11, 2018
Counties
46
Utilities
PGE 2,440, SCE 1,005, SDGE 330
CSLB license
840934

Is Real Goods Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (0 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2001 to 2026

YearInstalls interconnectedWith battery storage
200130
2002120
2003500
2004800
2005630
20061750
20071270
2008920
20091330
20103500
20116720
20124450
20136160
20148180
20151350
201620
201710
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 3,775 interconnected installs with a tariff recorded (3,775) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03,77399.9%not counted
NEM 2.020.1%not recorded
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 407 of Real Goods Solar’s installs the utility recorded a third-party ownership type: PPA 341, lease 39, prepaid lease 0, other 27. No residential system in the file lists a third-party owner name that matches Real Goods Solar exactly.

Third-party owner named on its installsInstalls
Kilowatt Systems, LLC92
Sunrun, Inc.86
PV Home PPA 1, LLC81
Sun Run, Inc.34
Greenday Finance 1, LLC24

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 2,680 of Real Goods Solar’s 3,775 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (955, 35.6%) used modules recorded as Sharp.

Across all years, 3,682 of Real Goods Solar’s 3,775 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (1,507, 40.9%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp0955
Canadian Solar0441
Kyocera0367
SolarWorld0287
Suntech0176
Inverter makerEnphase01,507
SMA01,075
Power-One0375
Fronius0315
Xantrex Technology Inc.0205

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,680 of 3,775 installs, inverters on 3,682. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
840934Not found in the CSLB License Master file pulled Nov 4, 20261,390

License numbers are the ones the utilities recorded on the interconnection applications (1,391 of 3,775 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Fresno406
Sonoma353
Santa Clara307
San Diego299
Riverside289
Orange269
Contra Costa211
Los Angeles197
Alameda154
Santa Cruz132
San Bernardino120
Tulare103
Marin102
San Francisco90
Kern79
Napa78
Mendocino76
Monterey70
San Mateo68
Madera61
Lake57
Solano36
Yolo35
Kings34
Ventura29
San Joaquin21
El Dorado17
Merced14
San Benito11
San Luis Obispo10
Butte7
Placer7
Calaveras6
Stanislaus5
Mariposa3
Santa Barbara3
Amador2
Colusa2
Humboldt2
Sutter2
Tuolumne2
Yuba2
Glenn1
Inyo1
Nevada1
Tehama1

Top cities

CityInstalls
Fresno218
San Jose146
Santa Rosa140
Irvine128
Clovis120
San Diego118
San Francisco90
Richmond73
Bakersfield64
Santa Cruz59
Napa48
Sebastopol46
Oakland44
Visalia40
Hemet38

Names as recorded by the utilities

The utilities recorded this installer under 40 spellings. The 25 most common are shown. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Real Goods Solar1,443
Real Goods728
REAL GOODS SOLAR583
Real Goods Solar, Inc. dba RGS Energy324
REAL GOODS295
Real Goods Solar, Inc.165
Real Goods Solar Inc86
Real Goods Solar, Inc66
Real Goods Solar Inc.9
Real Goods Solar, Inc dba RGS Energy9
Real Goods solar7
Real Goods Solar Inc dba RGS Energy7
Real goods Solar6
REAL GOODS SOLAR INC6
REAL GOODS SOLAR, INC4
REAL GOODS SOLAR, Inc.4
Real Goods Solar,Inc4
real Goods Solar3
REAL GOODS SOLAR, Inc3
Real Goods Inc.2
Real Goods Solar, dba RGS Energy2
REal Goods1
real goods solar1
Real Goods SOlar1
Real Goods Solar , Inc1

Common questions

Where does Real Goods Solar install solar?

Its installs are spread across 46 counties. The most are in Fresno County (406 installs), followed by Sonoma County (353).

How often does Real Goods Solar install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Real Goods Solar installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 3,775 interconnected installs with a tariff recorded (3,775) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.