REAL GOODS ENERGY
How many solar installs has REAL GOODS ENERGY done in California, and which license number is on its installs?
REAL GOODS ENERGY has 437 residential solar installs interconnected in California, active in the records from 2008 through 2015 (Jun 26, 2008 to Jan 9, 2015), most of them in Riverside County (274), Los Angeles County (53) and San Bernardino County (45). The license number recorded on most of its installs, 840934, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 437
- Last 24 months
- 0
- Total capacity
- 2,564.3 kW DC
- Median system size
- 4.9 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 70.3% of 323 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- PPA 137, lease 25, other 65
- First install
- Jun 26, 2008
- Latest install
- Jan 9, 2015
- Counties
- 11
- Utilities
- SCE 436, PGE 1
- CSLB license
- 840934
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2008 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2008 | 5 | 0 |
| 2009 | 43 | 0 |
| 2010 | 109 | 0 |
| 2011 | 94 | 0 |
| 2012 | 23 | 0 |
| 2013 | 69 | 0 |
| 2014 | 93 | 0 |
| 2015 | 1 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 437 interconnected installs with a tariff recorded (437) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 437 | 100.0% | not counted |
| NEM 2.0 | 0 | 0.0% | 0 |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 227 of REAL GOODS ENERGY’s installs the utility recorded a third-party ownership type: PPA 137, lease 25, prepaid lease 0, other 65. No residential system in the file lists a third-party owner name that matches REAL GOODS ENERGY exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Sun Run, Inc. | 111 |
| Kilowatt Systems, LLC | 29 |
| SunRun, Inc. | 20 |
| My Solar 1, LLC | 13 |
| Sunpower Solar Program 1, LLC | 13 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 1 of REAL GOODS ENERGY’s 437 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Kyocera.
Across all years, 437 of REAL GOODS ENERGY’s 437 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (205, 46.9%) used inverters recorded as SMA.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Kyocera | 0 | 1 |
| Inverter maker | SMA | 0 | 205 |
| Enphase | 0 | 192 | |
| ABB | 0 | 12 | |
| SunPower | 0 | 12 | |
| Xantrex Technology Inc. | 0 | 11 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1 of 437 installs, inverters on 437. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 840934 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 436 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (436 of 437 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- Real Goods Solar: 3,775 installs, license 840934
- REAL GOODS ENERGY TECH INC dba REAL GOOD: 402 installs, license 840934
- RGS Energy: 97 installs, license 840934
- REAL GOODS CARLSON: 50 installs, license 840934
Counties
| County | Installs |
|---|---|
| Riverside | 274 |
| Los Angeles | 53 |
| San Bernardino | 45 |
| Orange | 34 |
| Tulare | 17 |
| Ventura | 7 |
| Kings | 3 |
| Inyo | 1 |
| Kern | 1 |
| Monterey | 1 |
| Santa Barbara | 1 |
Top cities
| City | Installs |
|---|---|
| Murrieta | 110 |
| Hemet | 32 |
| Temecula | 16 |
| Riverside | 15 |
| Visalia | 14 |
| Corona | 9 |
| Palm Desert | 9 |
| Menifee | 8 |
| Palm Springs | 8 |
| San Jacinto | 8 |
| Lake Elsinore | 6 |
| Redlands | 6 |
| Apple Valley | 5 |
| Cathedral City | 5 |
| Claremont | 5 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| REAL GOODS ENERGY | 436 |
| Real Goods Energy | 1 |
Common questions
Where does REAL GOODS ENERGY install solar?
Its installs are spread across 11 counties. The most are in Riverside County (274 installs), followed by Los Angeles County (53).
How often does REAL GOODS ENERGY install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many REAL GOODS ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 437 interconnected installs with a tariff recorded (437) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.