Home solar in ZIP code 95139, California
Service city recorded on most installs: San Jose. County: Santa Clara County.
How many homes in ZIP code 95139 have solar?
PG&E, SCE and SDG&E interconnected 545 residential solar systems in ZIP code 95139 through Aug 31, 2026, 60 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded San Jose, Santa Clara County, as the service city on 545 of them. Sunrun has the most installs recorded in this ZIP, 86.
Counts of interconnected systems from utility records, not a rating of any installer.
Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
At a glance
- Residential solar installs
- 545
- Last 24 months
- 60 (Sep 2024 through Aug 2026)
- Capacity
- 3,402.1 kW DC
- Median system size
- 5.7 kW DC
- Net Billing Tariff (NEM 3.0)
- 75 installs, 13.8% of those with a tariff recorded
- Utility
- PGE 545
- First install in data
- May 29, 2002
- Latest install in data
- Aug 20, 2026
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2002 | 1 | 0 |
| 2003 | 0 | 0 |
| 2004 | 0 | 0 |
| 2005 | 1 | 0 |
| 2006 | 2 | 0 |
| 2007 | 4 | 0 |
| 2008 | 1 | 0 |
| 2009 | 1 | 0 |
| 2010 | 4 | 0 |
| 2011 | 4 | 0 |
| 2012 | 15 | 0 |
| 2013 | 31 | 0 |
| 2014 | 25 | 0 |
| 2015 | 34 | 0 |
| 2016 | 39 | 0 |
| 2017 | 16 | 0 |
| 2018 | 34 | 2 |
| 2019 | 29 | 2 |
| 2020 | 38 | 7 |
| 2021 | 37 | 4 |
| 2022 | 74 | 13 |
| 2023 | 72 | 13 |
| 2024 | 34 | 28 |
| 2025 | 37 | 31 |
| 2026 (through Aug 31, 2026) | 12 | 10 |
Battery storage
20.2% of the residential solar installs here include battery storage across all years (110 of 545). In the last 24 months the share was 83.3% (50 of 60).
Net metering tariff
Of the 545 installs with a net metering tariff recorded: NEM 1.0 165 (30.3%), NEM 2.0 305 (56.0%), the Net Billing Tariff (often called NEM 3.0) 75 (13.8%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Lease, PPA or owned
19.1% of the 545 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 441 are recorded as not third-party owned. Ownership types recorded: PPA 92, lease 11, other 1.
Installers by installs in 95139
Installers with a page in this index, most installs in this ZIP first. 111 such installers have at least one install here. 17 more installs were by 13 installer names without a page in this index. 13 were self-installed or had no installer recorded. Counts of connected systems, not a rating.
| Installer | Installs in 95139 | Last 24 months |
|---|---|---|
| Sunrun | 86 | 12 |
| Tesla Energy Operations (formerly SolarCity) | 81 | 11 |
| Vivint Solar Developer, LLC | 34 | 0 |
| SunPower | 23 | 0 |
| Future Energy Corporation | 16 | 0 |
| PetersenDean | 16 | 0 |
| FREEDOM FOREVER LLC | 11 | 5 |
| Clean Solar | 10 | 0 |
| Complete Solar | 10 | 1 |
| QUALITY FIRST HOME IMPROVEMENT INC | 10 | 2 |
City and county recorded for 95139
The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.
| Recorded as | Installs |
|---|---|
| City: San Jose | 545 |
| County: Santa Clara County | 545 |
Common questions
How common are home batteries with solar in 95139?
20.2% of the residential solar installs here include battery storage across all years (110 of 545). In the last 24 months the share was 83.3% (50 of 60).
How many solar installs in 95139 are under NEM 3.0?
75 of the 545 installs here with a tariff recorded (13.8%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.
Which solar installers have the most installs in 95139?
Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (86), Tesla Energy Operations (formerly SolarCity) (81), Vivint Solar Developer, LLC (34). These are counts of connected systems, not a rating of price, workmanship or service.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.