QUALITY FIRST HOME IMPROVEMENT INC has 1,107 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Dec 4, 2009 to Aug 3, 2026), most of them in Santa Clara County (499), Alameda County (103) and Solano County (83). CSLB lists license 875772 (QUALITY FIRST HOME IMPROVEMENT INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-8, C-17, C-39, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,107
Last 24 months
39
Total capacity
4,648.7 kW DC
Median system size
3.9 kW DC
With battery storage
4.5% all time; 61.5% last 24 months
Third-party owned
0.0% of 1,107 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
55 installs, latest Jan 27, 2026
Ownership types recorded
none recorded
First install
Dec 4, 2009
Latest install
Aug 3, 2026
Counties
30
Utilities
PGE 1,107
CSLB license
875772

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200930
2010400
2011280
2012770
2013300
2014600
2015790
2016800
2017930
2018970
20191230
20201162
2021912
2022578
2023648
2024418
20252621
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

55 of its 1,107 interconnected installs (5.0% of the 1,107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.9% of those include battery storage. The latest Net Billing Tariff install was approved Jan 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.040036.1%not counted
NEM 2.065258.9%22 (3.4%)
Net Billing Tariff555.0%28 (50.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on QUALITY FIRST HOME IMPROVEMENT INC’s installs. No residential system in the file lists a third-party owner name that matches QUALITY FIRST HOME IMPROVEMENT INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 35 of QUALITY FIRST HOME IMPROVEMENT INC’s 39 installs name a module maker in the “Generator Manufacturer” fields, and most of those (32, 91.4%) used modules recorded as Mission Solar.

In the last 24 months, 39 of QUALITY FIRST HOME IMPROVEMENT INC’s 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 23 of QUALITY FIRST HOME IMPROVEMENT INC’s 39 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (23, 100.0%) used batteries recorded as Enphase.

45 of 50 battery-paired PG&E and SCE installs (90.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar32108
LG4399
Sharp2188
Qcells1not in top list
SunEdison1not in top list
Inverter makerEnphase391,042
Fronius115
SMA1not in top list
SolarEdge14
SunPower14
Battery makerEnphase2345

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,006 of 1,107 installs, inverters on 1,107. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
875772QUALITY FIRST HOME IMPROVEMENT INC (Corporation)CLEAR, DISC Bond Filed| Pending Case/CITB General Building Contractor; C-8; C-17; C-39 Roofing ContractorApr 7, 2006Apr 30, 2028915

License numbers are the ones the utilities recorded on the interconnection applications (916 of 1,107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 875772. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara499
Alameda103
Solano83
Contra Costa70
San Joaquin63
Placer53
Yolo53
El Dorado33
Sutter28
San Mateo26
Yuba26
Santa Cruz14
Monterey11
San Benito10
Nevada8
Colusa5
Tehama3
Calaveras2
Napa2
Plumas2
San Francisco2
Sonoma2
Stanislaus2
Amador1
Butte1
Humboldt1
Marin1
Merced1
Shasta1
Tuolumne1

Top cities

CityInstalls
San Jose368
Stockton52
Fremont34
Sunnyvale30
Vacaville27
Milpitas25
Yuba City24
Vallejo23
Campbell21
West Sacramento19
Morgan Hill18
Newark18
Woodland18
Auburn16
Gilroy16

Names as recorded by the utilities

The utilities recorded this installer under 13 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
QUALITY FIRST HOME IMPROVEMENT INC457
QUALITY FIRST HOME IMPROVEMENT, INC175
QUALITY FIRST HOME IMPROVEMENT156
QUALITY FIRST HOME IMPROVEMENT, INC.116
Quality First Home Improvement, Inc.98
Quality First Home Improvement44
Quality First Home Improvement Inc17
Quality First Home Improvement, Inc17
Quality First Home Improvement Inc.14
QUALITY FIRST HOME IMPROVEMENT,INC.10
Quality first Home Improvement1
Quality First Home Improvement, INc.1
QUALITY FIRST HOME IMPROVEMENT.INC1

Common questions

Where does QUALITY FIRST HOME IMPROVEMENT INC install solar?

Its installs are spread across 30 counties. The most are in Santa Clara County (499 installs), followed by Alameda County (103).

How often does QUALITY FIRST HOME IMPROVEMENT INC install batteries with solar?

4.5% of its interconnected solar installs include battery storage across all years, and 61.5% in the last 24 months (24 of 39).

How many QUALITY FIRST HOME IMPROVEMENT INC installs are under NEM 3.0 (the Net Billing Tariff)?

55 of its 1,107 interconnected installs (5.0% of the 1,107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.