Advanced Home Energy

How many solar installs has Advanced Home Energy done in California, and which license number is on its installs?

Advanced Home Energy has 39 residential solar installs interconnected in California, active in the records from 2007 through 2016 (Apr 30, 2007 to Nov 4, 2016), most of them in Alameda County (21), Contra Costa County (13) and San Francisco County (2). CSLB lists license 877873 (ADVANCED HOME ENERGY INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-20, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
39
Last 24 months
0
Total capacity
157 kW DC
Median system size
3.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 39 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 30, 2007
Latest install
Nov 4, 2016
Counties
5
Utilities
PGE 39
CSLB license
877873

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
200710
200800
200910
201000
201100
201230
201320
2014100
2015140
201680
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.039100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Advanced Home Energy’s installs. No residential system in the file lists a third-party owner name that matches Advanced Home Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 39 of Advanced Home Energy’s 39 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 30.8%) used modules recorded as LG.

Across all years, 39 of Advanced Home Energy’s 39 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 69.2%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG012
Canadian Solar011
Qcells06
SolarWorld04
Suniva03
Inverter makerEnphase027
Fronius06
SMA04
APsystems (Altenergy Power System)01
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 39 installs, inverters on 39. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
877873ADVANCED HOME ENERGY INC (Corporation)CLEARB General Building Contractor; C-2; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorMay 17, 2006May 31, 202831

License numbers are the ones the utilities recorded on the interconnection applications (32 of 39 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 877873. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda21
Contra Costa13
San Francisco2
Santa Clara2
Marin1

Top cities

CityInstalls
Berkeley12
Oakland6
Lafayette4
Richmond3
El Cerrito2
San Francisco2
Albany1
Antioch1
El Sobrante1
Kensington1
Milpitas1
Orinda1
Pinole1
San Jose1
San Leandro1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Advanced Home Energy30
ADVANCED HOME ENERGY6
Advanced home Energy1
Advanced Home Energy Inc1
Advanced Home Energy, Inc1

Common questions

Where does Advanced Home Energy install solar?

Its installs are spread across 5 counties. The most are in Alameda County (21 installs), followed by Contra Costa County (13).

How often does Advanced Home Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Advanced Home Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 39 interconnected installs with a tariff recorded (39) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.