Auburn Solar

How many solar installs has Auburn Solar done in California, and which license number is on its installs?

Auburn Solar has 96 residential solar installs interconnected in California, active in the records from 2014 through 2026 (Jan 22, 2014 to Apr 15, 2026), most of them in Placer County (71), El Dorado County (10) and Nevada County (10). CSLB lists license 954036 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Nov 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
96
Last 24 months
20
Total capacity
641.7 kW DC
Median system size
6.2 kW DC
With battery storage
19.8% all time; 85.0% last 24 months
Third-party owned
0.0% of 96 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
19 installs, latest Apr 15, 2026
Ownership types recorded
none recorded
First install
Jan 22, 2014
Latest install
Apr 15, 2026
Counties
6
Utilities
PGE 96
CSLB license
954036, 868885

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
2014100
2015240
2016290
201710
201800
201900
202000
202100
202250
202340
202463
20251413
2026 (through Aug 31, 2026)33

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

19 of its 96 interconnected installs (19.8% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06365.6%not counted
NEM 2.01414.6%0 (0.0%)
Net Billing Tariff1919.8%19 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Auburn Solar’s installs. No residential system in the file lists a third-party owner name that matches Auburn Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 18 of Auburn Solar’s 20 installs name a module maker in the “Generator Manufacturer” fields, and most of those (10, 55.6%) used modules recorded as LONGi.

In the last 24 months, 20 of Auburn Solar’s 20 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (15, 75.0%) used inverters recorded as PointGuard Energy Inc..

In the last 24 months, 15 of Auburn Solar’s 20 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13, 86.7%) used batteries recorded as PointGuard Energy Inc..

17 of 19 battery-paired PG&E and SCE installs (89.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi1012
JA Solar66
REC35
Kyocera1not in top list
Inverter makerPointGuard Energy Inc.1516
Enphase448
SolarEdge229
Fronius11
Sigenergy1not in top list
Battery makerPointGuard Energy Inc.1314
Enphase12
Sigenergy11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 91 of 96 installs, inverters on 96. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Auburn Solar as developer on 0 battery storage projects and as installer on 21 (0 name it as both), 21 projects in all with 251 kWh of storage. 11 have the status Paid, with $65,664 in current incentive allocations. Applications were received from Jul 11, 2018 to Feb 18, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid11129$65,664
Cancelled10122$35,866

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage14172$31,0256$13,705
Equity Resiliency779$70,5055$51,959

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
954036Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorNov 1, 2010Nov 30, 202859
868885Sole owner license (name not shown)CLEARC-10 Electrical ContractorDec 7, 2005Dec 31, 202732

License numbers are the ones the utilities recorded on the interconnection applications (93 of 96 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 954036, 868885. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer71
El Dorado10
Nevada10
Yolo3
Tuolumne1
Yuba1

Top cities

CityInstalls
Auburn43
Lincoln8
Grass Valley7
Newcastle6
Meadow Vista4
Colfax3
Granite Bay3
Rocklin3
Cool2
Pilot Hill2
Shingle Springs2
West Sacramento2
Browns Valley1
Camino1
Dutch Flat1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Auburn Solar69
AUBURN SOLAR27

Common questions

Where does Auburn Solar install solar?

Its installs are spread across 6 counties. The most are in Placer County (71 installs), followed by El Dorado County (10).

How often does Auburn Solar install batteries with solar?

19.8% of its interconnected solar installs include battery storage across all years, and 85.0% in the last 24 months (17 of 20).

How many Auburn Solar installs are under NEM 3.0 (the Net Billing Tariff)?

19 of its 96 interconnected installs (19.8% of the 96 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.