Matson-Services

How many solar installs has Matson-Services done in California, and which license number is on its installs?

Matson-Services has 348 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Feb 20, 2008 to Jul 17, 2026), most of them in Placer County (238), Nevada County (33) and El Dorado County (31). CSLB lists license 868885 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
348
Last 24 months
10
Total capacity
2,738.5 kW DC
Median system size
6.8 kW DC
With battery storage
16.1% all time; 60.0% last 24 months
Third-party owned
0.0% of 347 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
9 installs, latest Jul 17, 2026
Ownership types recorded
none recorded
Median battery size
17.1 kWh (34 installs list a capacity)
First install
Feb 20, 2008
Latest install
Jul 17, 2026
Counties
18
Utilities
PGE 347, SCE 1
CSLB license
868885

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200810
2009100
2010160
201160
201260
2013170
201470
201580
201630
2017330
2018200
2019331
20205012
20215114
2022378
20233011
2024137
202542
2026 (through Aug 31, 2026)31

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

9 of its 348 interconnected installs (2.6% of the 348 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those include battery storage. The latest Net Billing Tariff install was approved Jul 17, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07722.1%not counted
NEM 2.026275.3%48 (18.3%)
Net Billing Tariff92.6%5 (55.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Matson-Services’s installs. No residential system in the file lists a third-party owner name that matches Matson-Services exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 9 of Matson-Services’ 10 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used modules recorded as Qcells.

In the last 24 months, 10 of Matson-Services’ 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (9, 90.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Matson-Services’ 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 80.0%) used batteries recorded as Enphase.

31 of 56 battery-paired PG&E and SCE installs (55.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells6not in top list
Canadian Solar157
Silfab1not in top list
Solaria191
Inverter makerEnphase9173
PointGuard Energy Inc.1not in top list
Battery makerEnphase410
PointGuard Energy Inc.1not in top list

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 319 of 348 installs, inverters on 348. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Matson-Services as developer on 62 battery storage projects and as installer on 27 (27 name it as both), 62 projects in all with 849 kWh of storage. 39 have the status Paid, with $233,550 in current incentive allocations. Applications were received from May 17, 2018 to May 20, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid39562$233,550
Reserved110$8,750
Cancelled22278$156,152

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage33436$76,12521$52,379
Equity Resiliency27381$314,67516$173,519
Large-Scale Storage233$7,6522$7,652

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
868885Sole owner license (name not shown)CLEARC-10 Electrical ContractorDec 7, 2005Dec 31, 2027286

License numbers are the ones the utilities recorded on the interconnection applications (288 of 348 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 868885. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Placer238
Nevada33
El Dorado31
Tuolumne20
Lake4
Yolo4
Humboldt3
Calaveras2
Sacramento2
Solano2
Yuba2
Napa1
San Bernardino1
San Joaquin1
Shasta1
Sierra1
Sutter1
Tehama1

Top cities

CityInstalls
Auburn149
Newcastle22
Jamestown19
Grass Valley16
Lincoln16
Rocklin14
Colfax13
Foresthill12
Meadow Vista11
Cool10
Placerville6
Granite Bay5
Pilot Hill5
Loomis4
Applegate3

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MATSON - SERVICES193
Matson-Services100
Matson Services51
Matson Services DBA Auburn Solar2
MATSON SERVICES1
Matson-Services dba Auburn Solar1

Common questions

Where does Matson-Services install solar?

Its installs are spread across 18 counties. The most are in Placer County (238 installs), followed by Nevada County (33).

How often does Matson-Services install batteries with solar?

16.1% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (6 of 10).

How many Matson-Services installs are under NEM 3.0 (the Net Billing Tariff)?

9 of its 348 interconnected installs (2.6% of the 348 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 55.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.