B&B Solar has 242 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Dec 9, 2009 to Aug 12, 2026), most of them in Shasta County (219), Tehama County (20) and Butte County (2). CSLB lists license 519561 (B & B SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
242
Last 24 months
31
Total capacity
2,257.6 kW DC
Median system size
8.8 kW DC
With battery storage
6.6% all time; 22.6% last 24 months
Third-party owned
0.0% of 242 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Aug 12, 2026
Ownership types recorded
none recorded
Median battery size
12.1 kWh (14 installs list a capacity)
First install
Dec 9, 2009
Latest install
Aug 12, 2026
Counties
4
Utilities
PGE 242
CSLB license
519561

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201090
201140
201260
201380
2014180
2015160
2016160
2017160
2018200
2019180
2020140
2021151
2022194
2023211
2024154
2025145
2026 (through Aug 31, 2026)121

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 242 interconnected installs (6.6% of the 242 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 43.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07932.6%not counted
NEM 2.014760.7%9 (6.1%)
Net Billing Tariff166.6%7 (43.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on B&B Solar’s installs. No residential system in the file lists a third-party owner name that matches B&B Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 31 of B&B Solar’s 31 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 38.7%) used modules recorded as REC.

In the last 24 months, 31 of B&B Solar’s 31 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 64.5%) used inverters recorded as SolarEdge.

In the last 24 months, 2 of B&B Solar’s 31 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as SolarEdge.

8 of 16 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1217
Meyer Burger (Industries) GmbH9not in top list
Aptos Solar736
Briggs & Stratton, LLC4not in top list
Canadian Solar1132
Inverter makerSolarEdge20150
Sol-Ark810
Enphase313
Battery makerSolarEdge23

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 233 of 242 installs, inverters on 242. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names B&B Solar as developer on 2 battery storage projects and as installer on 2 (2 name it as both), 2 projects in all with 17 kWh of storage. 1 have the status Paid, with $8,394 in current incentive allocations. Applications were received from Oct 2, 2020 to Sep 17, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid18$8,394
Cancelled18$1,679

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency18$8,3941$8,394
Small Residential Storage18$1,6790$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
519561B & B SOLAR INC (Corporation)CLEARC-46 Solar ContractorOct 20, 1987Sep 30, 2027202

License numbers are the ones the utilities recorded on the interconnection applications (210 of 242 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 519561. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Shasta219
Tehama20
Butte2
Glenn1

Top cities

CityInstalls
Redding111
Palo Cedro39
Cottonwood30
Anderson26
Red Bluff11
Millville5
Shingletown5
Bella Vista3
Oak Run3
Chico1
Corning1
Fall River Mills1
French Gulch1
Oroville1
Round Mountain1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
B&B Solar150
B & B SOLAR INC70
B & B Solar17
B&B Solar Inc4
B&B solar1

Common questions

Where does B&B Solar install solar?

Its installs are spread across 4 counties. The most are in Shasta County (219 installs), followed by Tehama County (20).

How often does B&B Solar install batteries with solar?

6.6% of its interconnected solar installs include battery storage across all years, and 22.6% in the last 24 months (7 of 31).

How many B&B Solar installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 242 interconnected installs (6.6% of the 242 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 43.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.