Bob Ruffa Electric Inc. has 66 residential solar installs interconnected in California, active in the records from 2006 through 2025 (Jul 17, 2006 to Apr 12, 2025), most of them in Tulare County (63), San Luis Obispo County (2) and Kern County (1). CSLB lists license 410069 (RUFFA BOB ELECTRIC INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Feb 29, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
3
Total capacity
445.4 kW DC
Median system size
6.4 kW DC
With battery storage
1.5% all time; 33.3% last 24 months
Third-party owned
0.0% of 49 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Apr 12, 2025
Ownership types recorded
none recorded
Median battery size
5 kWh (1 installs list a capacity)
First install
Jul 17, 2006
Latest install
Apr 12, 2025
Counties
3
Utilities
SCE 63, PGE 3
CSLB license
410069

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2006 to 2026

YearInstalls interconnectedWith battery storage
200630
200700
200840
200900
201010
201150
201220
201360
201450
2015130
201670
201720
201830
201920
202050
202110
202200
202320
202430
202521
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 12, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04669.7%not counted
NEM 2.01928.8%0 (0.0%)
Net Billing Tariff11.5%1 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Bob Ruffa Electric Inc.’s installs. No residential system in the file lists a third-party owner name that matches Bob Ruffa Electric Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Bob Ruffa Electric Inc.’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as Canadian Solar.

In the last 24 months, 3 of Bob Ruffa Electric Inc.’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 1 of Bob Ruffa Electric Inc.’s 3 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Enphase.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar36
Inverter makerEnphase345
Battery makerEnphase11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 66 installs, inverters on 66. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Bob Ruffa Electric Inc. as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 42 kWh of storage. 1 have the status Paid, with $36,354 in current incentive allocations. Applications were received from Mar 24, 2015 to Mar 24, 2015.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid142$36,354

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated142$36,3541$36,354

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
410069RUFFA BOB ELECTRIC INC (Corporation)CLEARC-10 Electrical ContractorAug 3, 1981Feb 29, 202865

License numbers are the ones the utilities recorded on the interconnection applications (65 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 410069. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tulare63
San Luis Obispo2
Kern1

Top cities

CityInstalls
Porterville39
Springville12
Strathmore4
Visalia3
Atascadero2
Exeter2
Terra Bella2
Bakersfield1
Tulare1

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Bob Ruffa Electric Inc.24
BOB RUFFA ELECTRIC INC19
BOB RUFFA ELECTRIC14
BOB RUFFA ELECTRIC, INC.7
Bob Ruffa Electric inc.1
BOB RUFFA ELECTRIC INC.1

Common questions

Where does Bob Ruffa Electric Inc. install solar?

Its installs are spread across 3 counties. The most are in Tulare County (63 installs), followed by San Luis Obispo County (2).

How often does Bob Ruffa Electric Inc. install batteries with solar?

1.5% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3).

How many Bob Ruffa Electric Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 66 interconnected installs (1.5% of the 66 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.