BROWER MECHANICAL CA LLC

How many solar installs has BROWER MECHANICAL CA LLC done in California, and which license number is on its installs?

BROWER MECHANICAL CA LLC has 142 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Feb 2, 2022 to Jul 7, 2026), most of them in Placer County (88), El Dorado County (18) and Yolo County (12). CSLB lists license 1081055 (BROWER MECHANICAL CA LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, C-10, C-20, C-36, C-46, expires Sep 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
142
Last 24 months
32
Total capacity
1,230.6 kW DC
Median system size
8.1 kW DC
With battery storage
28.9% all time; 84.4% last 24 months
Third-party owned
0.0% of 142 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
24 installs, latest May 11, 2026
Ownership types recorded
none recorded
Median battery size
40 kWh (1 installs list a capacity)
First install
Feb 2, 2022
Latest install
Jul 7, 2026
Counties
10
Utilities
PGE 142
CSLB license
1081055

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022314
2023695
2024137
20251110
2026 (through Aug 31, 2026)1815

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

24 of its 142 interconnected installs (16.9% of the 142 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.8% of those include battery storage. The latest Net Billing Tariff install was approved May 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.053.5%not counted
NEM 2.011379.6%13 (11.5%)
Net Billing Tariff2416.9%23 (95.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on BROWER MECHANICAL CA LLC’s installs. No residential system in the file lists a third-party owner name that matches BROWER MECHANICAL CA LLC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 31 of BROWER MECHANICAL CA LLC’s 32 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 58.1%) used modules recorded as Canadian Solar.

In the last 24 months, 32 of BROWER MECHANICAL CA LLC’s 32 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (32, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 27 of BROWER MECHANICAL CA LLC’s 32 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (27, 100.0%) used batteries recorded as Enphase.

38 of 41 battery-paired PG&E and SCE installs (92.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1845
Qcells865
REC78
SunPower44
Evergreen Solar11
Inverter makerEnphase32142
SMA26
SolarEdge28
SunPower26
ABB1not in top list
Battery makerEnphase2738

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 117 of 142 installs, inverters on 142. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1081055BROWER MECHANICAL CA LLC (Limited Liability)CLEARB General Building Contractor; C-2; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-36; C-46 Solar ContractorSep 10, 2021Sep 30, 2027142

License numbers are the ones the utilities recorded on the interconnection applications (142 of 142 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1081055. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer88
El Dorado18
Yolo12
Sutter8
Nevada7
Yuba4
Solano2
Amador1
San Joaquin1
Sonoma1

Top cities

CityInstalls
Rocklin29
Auburn22
Lincoln22
Davis12
El Dorado Hills8
Granite Bay7
Newcastle6
Yuba City6
Cameron Park5
Wheatland3
Loomis2
Cool1
Fairfield1
Foresthill1
Glen Ellen1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BROWER MECHANICAL CA LLC142

Common questions

Where does BROWER MECHANICAL CA LLC install solar?

Its installs are spread across 10 counties. The most are in Placer County (88 installs), followed by El Dorado County (18).

How often does BROWER MECHANICAL CA LLC install batteries with solar?

28.9% of its interconnected solar installs include battery storage across all years, and 84.4% in the last 24 months (27 of 32).

How many BROWER MECHANICAL CA LLC installs are under NEM 3.0 (the Net Billing Tariff)?

24 of its 142 interconnected installs (16.9% of the 142 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.