Building Energy & Power Solutions

How many solar installs has Building Energy & Power Solutions done in California, and which license number is on its installs?

Building Energy & Power Solutions has 115 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jul 1, 2022 to Aug 19, 2026), most of them in Placer County (88), El Dorado County (14) and Nevada County (6). CSLB lists license 1085781 (BUILDING ENERGY & POWER SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
66
Total capacity
769.4 kW DC
Median system size
4.5 kW DC
With battery storage
6.1% all time; 4.5% last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
68 installs, latest Aug 19, 2026
Ownership types recorded
none recorded
First install
Jul 1, 2022
Latest install
Aug 19, 2026
Counties
9
Utilities
PGE 115
CSLB license
1085781

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202281
2023232
2024261
2025413
2026 (through Aug 31, 2026)170

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

68 of its 115 interconnected installs (59.1% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.5% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04740.9%6 (12.8%)
Net Billing Tariff6859.1%1 (1.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Building Energy & Power Solutions’s installs. No residential system in the file lists a third-party owner name that matches Building Energy & Power Solutions exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 64 of Building Energy & Power Solutions’ 66 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 57.8%) used modules recorded as Aptos Solar.

In the last 24 months, 66 of Building Energy & Power Solutions’ 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (63, 95.5%) used inverters recorded as Enphase.

In the last 24 months, 2 of Building Energy & Power Solutions’ 66 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerAptos Solar3747
Qcells1654
JA Solar66
LONGi22
REC22
Inverter makerEnphase63109
SolarEdge37
Battery makerEnphase26

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 110 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1085781BUILDING ENERGY & POWER SOLUTIONS (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJan 7, 2022Jan 31, 2028112

License numbers are the ones the utilities recorded on the interconnection applications (112 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1085781. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Building Energy & Power Solutions’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
City and County of San Francisco108578111

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Placer88
El Dorado14
Nevada6
Contra Costa2
Marin1
Mendocino1
San Francisco1
Sonoma1
Yolo1

Top cities

CityInstalls
Rocklin24
Auburn19
Newcastle11
Loomis10
Meadow Vista8
Granite Bay7
El Dorado Hills6
Lincoln4
Grass Valley3
Penryn3
Cameron Park2
Camino2
Foresthill2
Placerville2
Antioch1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BUILDING ENERGY & POWER SOLUTIONS74
Building Energy & Power Solutions41

Common questions

Where does Building Energy & Power Solutions install solar?

Its installs are spread across 9 counties. The most are in Placer County (88 installs), followed by El Dorado County (14).

How often does Building Energy & Power Solutions install batteries with solar?

6.1% of its interconnected solar installs include battery storage across all years, and 4.5% in the last 24 months (3 of 66).

How many Building Energy & Power Solutions installs are under NEM 3.0 (the Net Billing Tariff)?

68 of its 115 interconnected installs (59.1% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.