California Green Energy Construction

How many solar installs has California Green Energy Construction done in California, and which license number is on its installs?

California Green Energy Construction has 209 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Mar 8, 2017 to Jun 24, 2026), most of them in Placer County (123), Nevada County (45) and El Dorado County (16). CSLB lists license 1029371 (CALIFORNIA GREEN ENERGY CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to California Green Energy Construction here carry more than one CSLB license number: 1029371 on 189 (CSLB holder CALIFORNIA GREEN ENERGY CONSTRUCTION, Grass Valley) and 280226 on 20 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
209
Last 24 months
42
Total capacity
1,836.9 kW DC
Median system size
8.7 kW DC
With battery storage
14.4% all time; 45.2% last 24 months
Third-party owned
0.0% of 209 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
31 installs, latest May 27, 2026
Ownership types recorded
none recorded
Median battery size
11.5 kWh (9 installs list a capacity)
First install
Mar 8, 2017
Latest install
Jun 24, 2026
Counties
11
Utilities
PGE 209
CSLB license
1029371, 280226

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
2017140
2018110
2019120
2020110
2021271
2022372
2023386
2024298
20251911
2026 (through Aug 31, 2026)112

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

31 of its 209 interconnected installs (14.8% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 67.7% of those include battery storage. The latest Net Billing Tariff install was approved May 27, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.031.4%not counted
NEM 2.017583.7%9 (5.1%)
Net Billing Tariff3114.8%21 (67.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on California Green Energy Construction’s installs. No residential system in the file lists a third-party owner name that matches California Green Energy Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 38 of California Green Energy Construction’s 42 installs name a module maker in the “Generator Manufacturer” fields, and most of those (36, 94.7%) used modules recorded as REC.

In the last 24 months, 42 of California Green Energy Construction’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (39, 92.9%) used inverters recorded as SolarEdge.

In the last 24 months, 10 of California Green Energy Construction’s 42 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 90.0%) used batteries recorded as PointGuard Energy Inc..

21 of 30 battery-paired PG&E and SCE installs (70.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC36154
Panasonic99
Alps Technology1not in top list
BP Solar1not in top list
CertainTeed1not in top list
Inverter makerSolarEdge39201
Panasonic99
PointGuard Energy Inc.99
Enphase3not in top list
SMA38
Battery makerPointGuard Energy Inc.99
Tesla112

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 193 of 209 installs, inverters on 208. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names California Green Energy Construction as developer on 4 battery storage projects and as installer on 4 (4 name it as both), 4 projects in all with 68 kWh of storage. 2 have the status Paid, with $28,140 in current incentive allocations. Applications were received from Apr 8, 2022 to Dec 26, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid240$28,140
Reserved115$23,380
Cancelled113$13,200

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency240$39,6001$26,400
Residential Solar and Storage Equity - AB 209 Non-POU115$23,3800$0
Small Residential Storage113$1,7401$1,740

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1029371CALIFORNIA GREEN ENERGY CONSTRUCTION (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorJul 27, 2017Jul 31, 2027189
280226Not found in the CSLB License Master file pulled Nov 4, 202620

License numbers are the ones the utilities recorded on the interconnection applications (209 of 209 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1029371. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer123
Nevada45
El Dorado16
San Joaquin7
Amador4
Butte4
Sutter4
Yolo2
Yuba2
Alameda1
Sonoma1

Top cities

CityInstalls
Auburn62
Grass Valley31
Colfax20
Lincoln9
Rocklin9
Meadow Vista7
El Dorado Hills5
Granite Bay5
Nevada City4
Applegate3
Manteca3
Newcastle3
Oroville3
Cameron Park2
Cool2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALIFORNIA GREEN ENERGY CONSTRUCTION170
California Green Energy Construction39

Common questions

Where does California Green Energy Construction install solar?

Its installs are spread across 11 counties. The most are in Placer County (123 installs), followed by Nevada County (45).

How often does California Green Energy Construction install batteries with solar?

14.4% of its interconnected solar installs include battery storage across all years, and 45.2% in the last 24 months (19 of 42).

How many California Green Energy Construction installs are under NEM 3.0 (the Net Billing Tariff)?

31 of its 209 interconnected installs (14.8% of the 209 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 67.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.