Calsun Electric & Solar Systems Inc

How many solar installs has Calsun Electric & Solar Systems Inc done in California, and which license number is on its installs?

Calsun Electric & Solar Systems Inc has 135 residential solar installs interconnected in California, active in the records from 2011 through 2019 (Mar 2, 2011 to Aug 1, 2019), most of them in San Luis Obispo County (128), Madera County (2) and Monterey County (2). CSLB lists license 993428 (CALSUN ELECTRIC SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Calsun Electric & Solar Systems Inc here carry more than one CSLB license number: 993428 on 112 (CSLB holder CALSUN ELECTRIC SYSTEMS, Paso Robles) and 944288 on 10 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
135
Last 24 months
0
Total capacity
1,086.9 kW DC
Median system size
7 kW DC
With battery storage
0.7% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 135 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Mar 2, 2011
Latest install
Aug 1, 2019
Counties
5
Utilities
PGE 135
CSLB license
993428, 944288

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201130
201200
201350
2014130
2015200
2016190
2017200
2018331
2019220
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 135 interconnected installs with a tariff recorded (135) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06044.4%not counted
NEM 2.07555.6%1 (1.3%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Calsun Electric & Solar Systems Inc’s installs. No residential system in the file lists a third-party owner name that matches Calsun Electric & Solar Systems Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 132 of Calsun Electric & Solar Systems Inc’s 135 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (41, 31.1%) used modules recorded as LG.

Across all years, 135 of Calsun Electric & Solar Systems Inc’s 135 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (115, 85.2%) used inverters recorded as SolarEdge.

Across all years, 1 of Calsun Electric & Solar Systems Inc’s 135 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as sonnen.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG041
Mission Solar034
SolarWorld022
Qcells018
Canadian Solar07
Inverter makerSolarEdge0115
Fronius012
SMA08
ABB01
Enphase01
Battery makersonnen01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 132 of 135 installs, inverters on 135. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Calsun Electric & Solar Systems Inc as developer on 5 battery storage projects and as installer on 5 (5 name it as both), 5 projects in all with 118 kWh of storage. 1 have the status Paid, with $19,412 in current incentive allocations. Applications were received from May 21, 2020 to Jan 5, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid119$19,412
Cancelled499$92,912

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency5118$112,3241$19,412

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
993428CALSUN ELECTRIC SYSTEMS (Corporation)CLEARC-10 Electrical ContractorJun 6, 2014Jun 30, 2028112
944288Not found in the CSLB License Master file pulled Nov 4, 202610

License numbers are the ones the utilities recorded on the interconnection applications (123 of 135 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 993428. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
San Luis Obispo128
Madera2
Monterey2
Santa Barbara2
Fresno1

Top cities

CityInstalls
Paso Robles77
Templeton19
Atascadero10
San Miguel9
San Luis Obispo5
Creston4
Bradley2
Coarsegold2
Santa Maria2
Clovis1
Lockwood1
Pismo Beach1
Santa Margarita1
Shandon1

Names as recorded by the utilities

The utilities recorded this installer under 17 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CALSUN ELECTRIC & SOLAR SYSTEMS INC.49
Calsun Electric & Solar Systems Inc28
Calsun Electric & Solar Systems, Inc14
Calsun Electric & Solar Systems9
CalSun Electric & Solar Systems9
CalSun Electric & Solar Systems Inc.8
calsun electric & solar systems, inc4
CALSUN ELECTRIC & SOLAR SYSTEMS3
CalSun Electric & Solar Systems Inc2
CALSUN ELECTRIC & SOLAR SYSTEMS, INC2
CALSUN Electric & Solar Systems1
calsun electric & solar systems inc1
calsun electric & solar systems inc.1
Calsun Electric & Solar Systems Inc.1
calsun electric & solar systems, inc.1
Calsun Electric & Solar Systems, Inc.1
CALSUN ELECTRIC & SOLAR SYSTEMS,INC1

Common questions

Where does Calsun Electric & Solar Systems Inc install solar?

Its installs are spread across 5 counties. The most are in San Luis Obispo County (128 installs), followed by Madera County (2).

How often does Calsun Electric & Solar Systems Inc install batteries with solar?

0.7% of its interconnected solar installs include battery storage across all years.

How many Calsun Electric & Solar Systems Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 135 interconnected installs with a tariff recorded (135) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.