Capital Aire Systems

How many solar installs has Capital Aire Systems done in California, and which license number is on its installs?

Capital Aire Systems has 116 residential solar installs interconnected in California, active in the records from 2010 through 2025 (Feb 25, 2010 to Feb 26, 2025), most of them in El Dorado County (114), Amador County (1) and Placer County (1). CSLB lists license 824635 (CAPITAL AIRE SYSTEMS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Jul 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
116
Last 24 months
1
Total capacity
748.2 kW DC
Median system size
6.2 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 116 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Feb 26, 2025
Ownership types recorded
none recorded
First install
Feb 25, 2010
Latest install
Feb 26, 2025
Counties
3
Utilities
PGE 116
CSLB license
824635

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201040
201100
201200
201310
201450
201590
2016180
2017170
2018180
2019280
202050
202130
202210
202340
202420
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 116 interconnected installs (0.9% of the 116 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 26, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03832.8%not counted
NEM 2.07766.4%0 (0.0%)
Net Billing Tariff10.9%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Capital Aire Systems’s installs. No residential system in the file lists a third-party owner name that matches Capital Aire Systems exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Capital Aire Systems’ 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of Capital Aire Systems’ 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1not in top list
Inverter makerEnphase1107

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 116 of 116 installs, inverters on 116. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
824635CAPITAL AIRE SYSTEMS (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorSep 19, 2003Jul 31, 2027111

License numbers are the ones the utilities recorded on the interconnection applications (111 of 116 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 824635. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado114
Amador1
Placer1

Top cities

CityInstalls
Placerville52
Cameron Park12
Shingle Springs9
El Dorado7
Camino5
El Dorado Hills5
Pollock Pines4
Somerset4
Lotus3
Diamond Springs2
Garden Valley2
Kelsey2
Auburn1
Coloma1
Cool1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Capital Aire Systems81
CAPITAL AIRE SYSTEMS33
capital aire systems2

Common questions

Where does Capital Aire Systems install solar?

Its installs are spread across 3 counties. The most are in El Dorado County (114 installs), followed by Amador County (1).

How often does Capital Aire Systems install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many Capital Aire Systems installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 116 interconnected installs (0.9% of the 116 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.