Donovan Fidler General Construction

How many solar installs has Donovan Fidler General Construction done in California, and which license number is on its installs?

Donovan Fidler General Construction has 77 residential solar installs interconnected in California, active in the records from 2016 through 2019 (Nov 18, 2016 to Aug 9, 2019), most of them in Kern County (72), Tulare County (2) and Kings County (1). CSLB lists license 908980 (sole owner license, name not shown) with status Contr Bond Susp in the License Master file pulled Nov 4, 2026, classifications B, C-33, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
77
Last 24 months
0
Total capacity
370.5 kW DC
Median system size
4.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
1.3% of 77 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 1
First install
Nov 18, 2016
Latest install
Aug 9, 2019
Counties
5
Utilities
PGE 77
CSLB license
908980

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201610
2017570
2018130
201960
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 77 interconnected installs with a tariff recorded (77) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.011.3%not counted
NEM 2.07698.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Donovan Fidler General Construction’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Donovan Fidler General Construction exactly.

Third-party owner named on its installsInstalls
Dividend1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 77 of Donovan Fidler General Construction’s 77 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (37, 48.1%) used modules recorded as Canadian Solar.

Across all years, 77 of Donovan Fidler General Construction’s 77 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (77, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar037
Hyundai020
Qcells011
LG05
JinkoSolar04
Inverter makerEnphase077

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 77 of 77 installs, inverters on 77. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
908980Sole owner license (name not shown)Contr Bond SuspB General Building Contractor; C-33Jan 11, 2008Sep 30, 202876

License numbers are the ones the utilities recorded on the interconnection applications (77 of 77 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 908980. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern72
Tulare2
Kings1
San Luis Obispo1
Santa Barbara1

Top cities

CityInstalls
Bakersfield53
Wasco7
Lamont5
Shafter3
Taft3
Dinuba2
Arvin1
Corcoran1
New Cuyama1
Paso Robles1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Donovan Fidler General Construction77

Common questions

Where does Donovan Fidler General Construction install solar?

Its installs are spread across 5 counties. The most are in Kern County (72 installs), followed by Tulare County (2).

How often does Donovan Fidler General Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Donovan Fidler General Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 77 interconnected installs with a tariff recorded (77) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.