Economic Energy Solutions Inc.

How many solar installs has Economic Energy Solutions Inc. done in California, and which license number is on its installs?

Economic Energy Solutions Inc. has 127 residential solar installs interconnected in California, active in the records from 2009 through 2026 (Dec 23, 2009 to Mar 25, 2026), most of them in Placer County (87), El Dorado County (13) and Nevada County (7). CSLB lists license 774452 (ECONOMIC ENERGY SOLUTIONS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, D-52, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
127
Last 24 months
16
Total capacity
937.6 kW DC
Median system size
7 kW DC
With battery storage
15.0% all time; 62.5% last 24 months
Third-party owned
0.0% of 127 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
10 installs, latest Jan 5, 2026
Ownership types recorded
none recorded
Median battery size
17.1 kWh (5 installs list a capacity)
First install
Dec 23, 2009
Latest install
Mar 25, 2026
Counties
12
Utilities
PGE 127
CSLB license
774452

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201050
201120
201210
201300
201430
2015170
201690
2017150
201860
201980
202081
2021123
2022134
202390
202421
2025149
2026 (through Aug 31, 2026)21

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

10 of its 127 interconnected installs (7.9% of the 127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The latest Net Billing Tariff install was approved Jan 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.04132.3%not counted
NEM 2.07659.8%10 (13.2%)
Net Billing Tariff107.9%8 (80.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Economic Energy Solutions Inc.’s installs. No residential system in the file lists a third-party owner name that matches Economic Energy Solutions Inc. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 14 of Economic Energy Solutions Inc.’s 16 installs name a module maker in the “Generator Manufacturer” fields, and most of those (13, 92.9%) used modules recorded as REC.

In the last 24 months, 16 of Economic Energy Solutions Inc.’s 16 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 9 of Economic Energy Solutions Inc.’s 16 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Enphase.

13 of 19 battery-paired PG&E and SCE installs (68.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC1324
Sanyo224
Generac1not in top list
Kyocera1not in top list
Trina Solar1not in top list
Inverter makerEnphase1656
APsystems (Altenergy Power System)1not in top list
Delta Electronics1not in top list
PV Powered13
SolarEdge169
Battery makerEnphase911

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 107 of 127 installs, inverters on 126. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Economic Energy Solutions Inc. as developer on 12 battery storage projects and as installer on 11 (11 name it as both), 12 projects in all with 224 kWh of storage. 9 have the status Paid, with $133,402 in current incentive allocations. Applications were received from Feb 15, 2019 to Mar 31, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid9154$133,402
Cancelled370$45,380

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency9172$163,0587$120,790
Small Residential Storage226$5,4881$2,376
Large-Scale Storage127$10,2361$10,236

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
774452ECONOMIC ENERGY SOLUTIONS INC (Corporation)CLEARB General Building Contractor; D-52Feb 2, 2000Jun 30, 2028118

License numbers are the ones the utilities recorded on the interconnection applications (118 of 127 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 774452. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer87
El Dorado13
Nevada7
Alameda4
Contra Costa4
San Mateo3
Butte2
San Joaquin2
Sutter2
Santa Clara1
Santa Cruz1
Sonoma1

Top cities

CityInstalls
Auburn29
Meadow Vista19
Colfax10
Lincoln7
Rocklin7
Granite Bay5
Loomis5
Newcastle5
Foresthill4
Pilot Hill3
Shingle Springs3
Magalia2
San Bruno2
Yuba City2
Cameron Park1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ECONOMIC ENERGY SOLUTIONS INC58
Economic Energy Solutions Inc.48
Economic Energy Solutions20
Economic Energy Solutions, Inc1

Common questions

Where does Economic Energy Solutions Inc. install solar?

Its installs are spread across 12 counties. The most are in Placer County (87 installs), followed by El Dorado County (13).

How often does Economic Energy Solutions Inc. install batteries with solar?

15.0% of its interconnected solar installs include battery storage across all years, and 62.5% in the last 24 months (10 of 16).

How many Economic Energy Solutions Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

10 of its 127 interconnected installs (7.9% of the 127 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 80.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.