eFlow Solar Energy

How many solar installs has eFlow Solar Energy done in California, and which license number is on its installs?

eFlow Solar Energy has 62 residential solar installs interconnected in California, active in the records from 2019 through 2025 (Feb 19, 2019 to Mar 7, 2025), most of them in Contra Costa County (29), Alameda County (15) and Solano County (6). The license number recorded on most of its installs, 905549, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
62
Last 24 months
1
Total capacity
437.7 kW DC
Median system size
6.4 kW DC
With battery storage
6.5% all time; 0.0% last 24 months
Third-party owned
0.0% of 62 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
4 installs, latest Aug 23, 2024
Ownership types recorded
none recorded
Median battery size
27.5 kWh (2 installs list a capacity)
First install
Feb 19, 2019
Latest install
Mar 7, 2025
Counties
8
Utilities
PGE 62
CSLB license
905549

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019180
202041
2021110
2022110
2023130
202443
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

4 of its 62 interconnected installs (6.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 23, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.05893.5%1 (1.7%)
Net Billing Tariff46.5%3 (75.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on eFlow Solar Energy’s installs. No residential system in the file lists a third-party owner name that matches eFlow Solar Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of eFlow Solar Energy’s 1 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as Qcells.

In the last 24 months, 1 of eFlow Solar Energy’s 1 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (1, 100.0%) used inverters recorded as Generac.

In the last 24 months, none of eFlow Solar Energy’s 1 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

3 of 4 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells127
Inverter makerGenerac16
Battery makerEnphase02
Generac01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 62 of 62 installs, inverters on 62. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
905549Not found in the CSLB License Master file pulled Nov 4, 202662

License numbers are the ones the utilities recorded on the interconnection applications (62 of 62 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list eFlow Solar Energy’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2021Total
unincorporated Marin County90554911

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa29
Alameda15
Solano6
San Joaquin5
Santa Clara3
Calaveras2
Marin1
Yolo1

Top cities

CityInstalls
Oakley10
Brentwood6
Rio Vista6
Pleasanton5
Antioch4
Livermore4
San Jose3
Discovery Bay2
Manteca2
Oakland2
Piedmont2
Stockton2
Angels Camp1
Bay Point1
Berkeley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
EFLOW SOLAR ENERGY45
eFlow Solar Energy17

Common questions

Where does eFlow Solar Energy install solar?

Its installs are spread across 8 counties. The most are in Contra Costa County (29 installs), followed by Alameda County (15).

How often does eFlow Solar Energy install batteries with solar?

6.5% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1).

How many eFlow Solar Energy installs are under NEM 3.0 (the Net Billing Tariff)?

4 of its 62 interconnected installs (6.5% of the 62 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.