ES Electrical Construction Inc. has 155 residential solar installs interconnected in California, active in the records from 2008 through 2026 (Jul 30, 2008 to Jul 15, 2026), most of them in Placer County (123), El Dorado County (12) and Alameda County (4). The license number recorded on most of its installs, 952101, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
155
Last 24 months
13
Total capacity
1,108.7 kW DC
Median system size
6.6 kW DC
With battery storage
7.7% all time; 92.3% last 24 months
Third-party owned
1.3% of 155 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest Jul 15, 2026
Ownership types recorded
PPA 2
Median battery size
13.5 kWh (5 installs list a capacity)
First install
Jul 30, 2008
Latest install
Jul 15, 2026
Counties
13
Utilities
PGE 155
CSLB license
952101

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2008 to 2026

YearInstalls interconnectedWith battery storage
200850
200960
2010160
201150
201270
2013190
2014200
2015240
2016230
201740
201810
2019110
202000
202100
202210
202300
202400
202543
2026 (through Aug 31, 2026)99

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 155 interconnected installs (8.4% of the 155 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012681.3%not counted
NEM 2.01610.3%0 (0.0%)
Net Billing Tariff138.4%12 (92.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of ES Electrical Construction Inc.’s installs the utility recorded a third-party ownership type: PPA 2, lease 0, prepaid lease 0, other 0. Across all installers, 5 residential systems list a third-party owner name that matches ES Electrical Construction Inc. exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
ES Electrical Construction Inc.2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of ES Electrical Construction Inc.’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (5, 38.5%) used modules recorded as JA Solar.

In the last 24 months, 13 of ES Electrical Construction Inc.’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (6, 46.2%) used inverters recorded as Enphase.

In the last 24 months, 12 of ES Electrical Construction Inc.’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (6, 50.0%) used batteries recorded as Tesla.

12 of 12 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar55
CertainTeed3not in top list
REC3117
Qcells2not in top list
Inverter makerEnphase613
Tesla6not in top list
FranklinWH2not in top list
SolarEdge177
Battery makerTesla66
Enphase33
FranklinWH22
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 154 of 155 installs, inverters on 155. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ES Electrical Construction Inc. as developer on 3 battery storage projects and as installer on 2 (2 name it as both), 3 projects in all with 86 kWh of storage. 2 have the status Paid, with $49,344 in current incentive allocations. Applications were received from Jun 2, 2025 to Dec 12, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid256$49,344
Cancelled130$4,500

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage256$6,7501$2,250
Residential Solar and Storage Equity - AB 209 Non-POU130$47,0941$47,094

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
952101Not found in the CSLB License Master file pulled Nov 4, 202691

License numbers are the ones the utilities recorded on the interconnection applications (91 of 155 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Placer123
El Dorado12
Alameda4
Nevada4
Solano3
Yuba2
Amador1
Butte1
Fresno1
Madera1
San Joaquin1
Santa Clara1
Sutter1

Top cities

CityInstalls
Loomis25
Auburn22
Penryn21
Newcastle18
Lincoln16
Rocklin10
Cool6
Granite Bay5
El Dorado Hills3
Grass Valley3
Pleasanton3
Meadow Vista2
Vacaville2
Clements1
El Dorado1

Names as recorded by the utilities

The utilities recorded this installer under 9 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ES Electrical Construction Inc.84
ES Electrical Construction, Inc.29
ES ELECTRICAL CONSTRUCTION INC14
ES Electrical Construction Inc13
ES ELECTRICAL CONSTRUCTION INC.7
ES Electrical Construction4
Es Electrical Construction Inc.2
ES Electrical Construction, Inc1
ES Electrical Construction. Inc.1

Common questions

Where does ES Electrical Construction Inc. install solar?

Its installs are spread across 13 counties. The most are in Placer County (123 installs), followed by El Dorado County (12).

How often does ES Electrical Construction Inc. install batteries with solar?

7.7% of its interconnected solar installs include battery storage across all years, and 92.3% in the last 24 months (12 of 13).

How many ES Electrical Construction Inc. installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 155 interconnected installs (8.4% of the 155 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.