How many solar installs has Gayler Construction done in California, and which license number is on its installs?

Gayler Construction has 392 residential solar installs interconnected in California, active in the records from 2011 through 2014 (Jun 1, 2011 to Sep 22, 2014), most of them in Contra Costa County (106), Alameda County (82) and San Francisco County (59). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
392
Last 24 months
0
Total capacity
700.2 kW DC
Median system size
1.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 392 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jun 1, 2011
Latest install
Sep 22, 2014
Counties
10
Utilities
PGE 392
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
2011140
20121400
20131740
2014640
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 392 interconnected installs with a tariff recorded (392) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0392100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Gayler Construction’s installs. No residential system in the file lists a third-party owner name that matches Gayler Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 392 of Gayler Construction’s 392 installs name a module maker in the “Generator Manufacturer” fields, and most of those (378, 96.4%) used modules recorded as Canadian Solar.

Across all years, 392 of Gayler Construction’s 392 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (392, 100.0%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar0378
Yingli014
Sharp01
Inverter makerEnphase0392

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 392 of 392 installs, inverters on 392. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 392 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Contra Costa106
Alameda82
San Francisco59
San Mateo43
Napa35
Solano29
Santa Clara14
Marin9
Sonoma8
San Joaquin7

Top cities

CityInstalls
San Francisco59
Napa34
Fremont18
Berkeley17
Martinez12
San Jose12
San Leandro11
Vallejo11
Fairfield9
Richmond9
Brentwood8
El Sobrante8
Pinole8
Antioch7
Burlingame7

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Gayler Construction368
GAYLER CONSTRUCTION20
gayler Construction2
Gayler construction2

Common questions

Where does Gayler Construction install solar?

Its installs are spread across 10 counties. The most are in Contra Costa County (106 installs), followed by Alameda County (82).

How often does Gayler Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Gayler Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 392 interconnected installs with a tariff recorded (392) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.