Green Air HVAC
How many solar installs has Green Air HVAC done in California, and which license number is on its installs?
Green Air HVAC has 44 residential solar installs interconnected in California, active in the records from 2012 through 2019 (Mar 1, 2012 to Sep 17, 2019), most of them in Contra Costa County (27), Alameda County (11) and Santa Clara County (3). CSLB lists license 916517 (GREEN AIR HEATING AND AIR CONDITIONING INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-20, C-46, expires Jun 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 44
- Last 24 months
- 0
- Total capacity
- 273.3 kW DC
- Median system size
- 5.9 kW DC
- With battery storage
- 6.8% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 44 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Mar 1, 2012
- Latest install
- Sep 17, 2019
- Counties
- 4
- Utilities
- PGE 44
- CSLB license
- 916517
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2012 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2012 | 10 | 0 |
| 2013 | 23 | 0 |
| 2014 | 0 | 0 |
| 2015 | 0 | 0 |
| 2016 | 2 | 0 |
| 2017 | 1 | 0 |
| 2018 | 5 | 0 |
| 2019 | 3 | 3 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 35 | 79.5% | not counted |
| NEM 2.0 | 9 | 20.5% | 3 (33.3%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on Green Air HVAC’s installs. No residential system in the file lists a third-party owner name that matches Green Air HVAC exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 41 of Green Air HVAC’s 44 installs name a module maker in the “Generator Manufacturer” fields, and most of those (27, 65.9%) used modules recorded as SolarWorld.
Across all years, 44 of Green Air HVAC’s 44 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (24, 54.5%) used inverters recorded as Enphase.
0 of 3 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SolarWorld | 0 | 27 |
| Suniva | 0 | 6 | |
| LG | 0 | 4 | |
| Canadian Solar | 0 | 1 | |
| ET Solar Industry, Ltd. | 0 | 1 | |
| Inverter maker | Enphase | 0 | 24 |
| SolarEdge | 0 | 19 | |
| Tesla | 0 | 3 | |
| Fronius | 0 | 1 | |
| SMA | 0 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 41 of 44 installs, inverters on 44. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names Green Air HVAC as developer on 0 battery storage projects and as installer on 99 (0 name it as both), 99 projects in all with 3,617 kWh of storage. 81 have the status Paid, with $762,400 in current incentive allocations. Applications were received from Oct 15, 2018 to Mar 17, 2022.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 81 | 2,838 | $762,400 |
| Cancelled | 18 | 779 | $276,429 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Large-Scale Storage | 63 | 2,785 | $661,490 | 52 | $521,768 |
| Small Residential Storage | 24 | 475 | $94,540 | 22 | $88,160 |
| Equity Resiliency | 12 | 356 | $282,799 | 7 | $152,472 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 916517 | GREEN AIR HEATING AND AIR CONDITIONING INC (Corporation) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar Contractor | Jun 2, 2008 | Jun 30, 2028 | 11 |
License numbers are the ones the utilities recorded on the interconnection applications (11 of 44 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 916517. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list Green Air HVAC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2020 | 2021 | 2022 | 2023 | 2024 | 2025 | Total |
|---|---|---|---|---|---|---|---|---|
| City and County of San Francisco | 916517 | 2 | 0 | 1 | 1 | 4 | 11 | 19 |
| unincorporated Marin County | 916517 | 0 | 2 | 0 | 0 | 0 | 0 | 2 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- GREEN AIR HEATING AND AIR CONDITIONING INC: 314 installs, license 916517
- Green Air: 110 installs, license 916517
- Green Air Heating and Air Conditioning I: 45 installs, license 916517
Counties
| County | Installs |
|---|---|
| Contra Costa | 27 |
| Alameda | 11 |
| Santa Clara | 3 |
| Solano | 3 |
Top cities
| City | Installs |
|---|---|
| Oakland | 5 |
| Walnut Creek | 5 |
| Moraga | 4 |
| Pleasant Hill | 4 |
| Concord | 3 |
| San Ramon | 3 |
| Benicia | 2 |
| Danville | 2 |
| Livermore | 2 |
| Martinez | 2 |
| Orinda | 2 |
| Pleasanton | 2 |
| Albany | 1 |
| Brentwood | 1 |
| Campbell | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| Green Air HVAC | 38 |
| Green Air HVAC Inc. | 3 |
| Green AIR HVAC | 1 |
| Green Air HVAC Inc | 1 |
| Green Air HVAC, Inc | 1 |
Common questions
Where does Green Air HVAC install solar?
Its installs are spread across 4 counties. The most are in Contra Costa County (27 installs), followed by Alameda County (11).
How often does Green Air HVAC install batteries with solar?
6.8% of its interconnected solar installs include battery storage across all years.
How many Green Air HVAC installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 44 interconnected installs with a tariff recorded (44) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.