Greg Gayler Construction Co.

How many solar installs has Greg Gayler Construction Co. done in California, and which license number is on its installs?

Greg Gayler Construction Co. has 63 residential solar installs interconnected in California, active in the records from 2011 through 2020 (Dec 1, 2011 to Mar 27, 2020), most of them in Alameda County (23), Contra Costa County (10) and Solano County (9). CSLB lists license 414805 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-2, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
63
Last 24 months
0
Total capacity
276.1 kW DC
Median system size
3.5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 63 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Dec 1, 2011
Latest install
Mar 27, 2020
Counties
13
Utilities
PGE 63
CSLB license
414805

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201200
201350
201430
201590
2016140
2017170
2018110
201920
202010
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.03250.8%not counted
NEM 2.03149.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Greg Gayler Construction Co.’s installs. No residential system in the file lists a third-party owner name that matches Greg Gayler Construction Co. exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 61 of Greg Gayler Construction Co.’s 63 installs name a module maker in the “Generator Manufacturer” fields, and most of those (36, 59.0%) used modules recorded as Canadian Solar.

Across all years, 63 of Greg Gayler Construction Co.’s 63 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (59, 93.7%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar036
SolarWorld013
Qcells04
REC03
Mission Solar02
Inverter makerEnphase059
Siemens Solar Industries02
Power-One01
PV Powered01
SunPower01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 61 of 63 installs, inverters on 63. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
414805Sole owner license (name not shown)CLEARB General Building Contractor; C-2Nov 27, 1981Nov 30, 202756

License numbers are the ones the utilities recorded on the interconnection applications (56 of 63 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 414805. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Alameda23
Contra Costa10
Solano9
San Joaquin6
Santa Clara6
Yolo2
Butte1
El Dorado1
Marin1
Merced1
San Francisco1
San Mateo1
Sonoma1

Top cities

CityInstalls
Oakland6
San Jose5
Berkeley4
San Leandro4
Stockton4
Antioch3
Vallejo3
Concord2
Hayward2
Pleasanton2
Suisun City2
Vacaville2
Albany1
Atwater1
Benicia1

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Greg Gayler Construction Co.46
Greg Gayler Construction9
Greg Gayler Construction Co2
Greg Gayler Construction Company2
GREG GAYLER CONSTRUCTION1
Greg Gayler construction co1
Greg Gayler Construction CO1
GREG GAYLER CONSTRUCTION CO.1

Common questions

Where does Greg Gayler Construction Co. install solar?

Its installs are spread across 13 counties. The most are in Alameda County (23 installs), followed by Contra Costa County (10).

How often does Greg Gayler Construction Co. install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Greg Gayler Construction Co. installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 63 interconnected installs with a tariff recorded (63) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.