Greg Tomsik Construction

How many solar installs has Greg Tomsik Construction done in California, and which license number is on its installs?

Greg Tomsik Construction has 158 residential solar installs interconnected in California, active in the records from 2009 through 2022 (Jan 30, 2009 to Mar 22, 2022), most of them in Shasta County (139), Tehama County (14) and Butte County (2). CSLB lists license 586698 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jan 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
158
Last 24 months
0
Total capacity
1,254.1 kW DC
Median system size
7.5 kW DC
With battery storage
0.6% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 158 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jan 30, 2009
Latest install
Mar 22, 2022
Counties
6
Utilities
PGE 158
CSLB license
586698

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200980
201050
201160
2012120
201330
201470
2015210
2016240
2017270
2018281
2019160
202000
202100
202210
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 158 interconnected installs with a tariff recorded (158) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08956.3%not counted
NEM 2.06943.7%1 (1.4%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Greg Tomsik Construction’s installs. No residential system in the file lists a third-party owner name that matches Greg Tomsik Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 154 of Greg Tomsik Construction’s 158 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (41, 26.6%) used modules recorded as Canadian Solar.

Across all years, 158 of Greg Tomsik Construction’s 158 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (57, 36.1%) used inverters recorded as Enphase.

0 of 1 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar041
SolarWorld035
Advance Power018
Auxin Solar017
BP Solar012
Inverter makerEnphase057
APsystems (Altenergy Power System)052
SMA023
Fronius015
Xantrex Technology Inc.08

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 154 of 158 installs, inverters on 158. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
586698Sole owner license (name not shown)CLEARB General Building ContractorJan 24, 1990Jan 31, 2028115

License numbers are the ones the utilities recorded on the interconnection applications (116 of 158 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 586698. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Shasta139
Tehama14
Butte2
Glenn1
Sutter1
Yuba1

Top cities

CityInstalls
Redding46
Anderson32
Cottonwood23
Palo Cedro20
Red Bluff8
Millville5
Shingletown4
Whitmore3
Bella Vista2
Corning2
Montgomery Creek2
Chico1
French Gulch1
Igo1
Los Molinos1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Greg Tomsik Construction116
Greg Tomsik Construction DBA Advance Power Redding34
GREG TOMSIK CONSTRUCTION5
Greg Tomsik Construction DBA Advance Pow2
greg tomsik construction1

Common questions

Where does Greg Tomsik Construction install solar?

Its installs are spread across 6 counties. The most are in Shasta County (139 installs), followed by Tehama County (14).

How often does Greg Tomsik Construction install batteries with solar?

0.6% of its interconnected solar installs include battery storage across all years.

How many Greg Tomsik Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 158 interconnected installs with a tariff recorded (158) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.