Hutchinson Construction Inc

How many solar installs has Hutchinson Construction Inc done in California, and which license number is on its installs?

Hutchinson Construction Inc has 40 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Apr 2, 2013 to Apr 20, 2026), most of them in San Luis Obispo County (30), Santa Barbara County (6) and Fresno County (2). CSLB lists license 976673 (HUTCHINSON CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
5
Total capacity
335.5 kW DC
Median system size
6.4 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Mar 12, 2026
Ownership types recorded
none recorded
First install
Apr 2, 2013
Latest install
Apr 20, 2026
Counties
5
Utilities
PGE 38, SCE 2
CSLB license
976673

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201430
201520
201610
201710
201870
201920
202030
202140
202260
202300
202450
202520
2026 (through Aug 31, 2026)30

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 40 interconnected installs (2.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Mar 12, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0717.5%not counted
NEM 2.03280.0%0 (0.0%)
Net Billing Tariff12.5%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Hutchinson Construction Inc’s installs. No residential system in the file lists a third-party owner name that matches Hutchinson Construction Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Hutchinson Construction Inc’s 5 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Phono Solar Technology.

In the last 24 months, 5 of Hutchinson Construction Inc’s 5 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 60.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPhono Solar Technology1not in top list
Trina Solar1not in top list
Znshine1not in top list
Inverter makerSMA329
Solis (Ginlong)37

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 37 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
976673HUTCHINSON CONSTRUCTION INC (Corporation)CLEARB General Building ContractorSep 15, 2012Sep 30, 202834

License numbers are the ones the utilities recorded on the interconnection applications (38 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 976673. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Luis Obispo30
Santa Barbara6
Fresno2
Shasta1
Ventura1

Top cities

CityInstalls
Paso Robles13
Templeton13
Santa Ynez4
San Miguel2
Solvang2
Atascadero1
Clovis1
Ojai1
Palo Cedro1
San Luis Obispo1
Shaver Lake1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HUTCHINSON CONSTRUCTION INC20
Hutchinson Construction Inc13
HUTCHINSON CONSTRUCTION COMPANY3
Hutchinson Construction1
Hutchinson Construction Company1
Hutchinson Construction inc1
Hutchinson Construction Inc.1

Common questions

Where does Hutchinson Construction Inc install solar?

Its installs are spread across 5 counties. The most are in San Luis Obispo County (30 installs), followed by Santa Barbara County (6).

How often does Hutchinson Construction Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 5).

How many Hutchinson Construction Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 40 interconnected installs (2.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.