Imperial Electric Service Inc

How many solar installs has Imperial Electric Service Inc done in California, and which license number is on its installs?

Imperial Electric Service Inc has 40 residential solar installs interconnected in California, active in the records from 2017 through 2026 (Feb 27, 2017 to May 9, 2026), most of them in Fresno County (27), Madera County (4) and Kern County (2). CSLB lists license 1015336 (IMPERIAL ELECTRIC SERVICE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
40
Last 24 months
7
Total capacity
384.4 kW DC
Median system size
8 kW DC
With battery storage
20.0% all time; 85.7% last 24 months
Third-party owned
0.0% of 40 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
7 installs, latest May 9, 2026
Ownership types recorded
none recorded
Median battery size
15 kWh (1 installs list a capacity)
First install
Feb 27, 2017
Latest install
May 9, 2026
Counties
7
Utilities
PGE 38, SCE 2
CSLB license
1015336

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2017 to 2026

YearInstalls interconnectedWith battery storage
201750
201830
201930
202020
202100
2022101
202381
202420
202544
2026 (through Aug 31, 2026)32

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

7 of its 40 interconnected installs (17.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The latest Net Billing Tariff install was approved May 9, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.012.5%not counted
NEM 2.03280.0%2 (6.3%)
Net Billing Tariff717.5%5 (71.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Imperial Electric Service Inc’s installs. No residential system in the file lists a third-party owner name that matches Imperial Electric Service Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 7 of Imperial Electric Service Inc’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 71.4%) used modules recorded as JA Solar.

In the last 24 months, 7 of Imperial Electric Service Inc’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (7, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 5 of Imperial Electric Service Inc’s 7 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 60.0%) used batteries recorded as FranklinWH.

7 of 8 battery-paired PG&E and SCE installs (87.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar55
JinkoSolar1not in top list
Kyocera1not in top list
LONGi1not in top list
SunPower1not in top list
Inverter makerEnphase738
FranklinWH23
Fronius11
SunPower11
Battery makerFranklinWH34
Enphase23

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 39 of 40 installs, inverters on 40. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1015336IMPERIAL ELECTRIC SERVICE (Corporation)CLEARC-10 Electrical ContractorJun 20, 2016Apr 30, 202840

License numbers are the ones the utilities recorded on the interconnection applications (40 of 40 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1015336. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Fresno27
Madera4
Kern2
Merced2
Solano2
Tulare2
Kings1

Top cities

CityInstalls
Fresno17
Clovis7
Atwater2
Madera2
Auberry1
Bakersfield1
Coarsegold1
Fairfield1
Hanford1
Kingsburg1
North Fork1
Porterville1
Reedley1
Sanger1
Vallejo1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
IMPERIAL ELECTRIC SERVICE29
Imperial Electric Service Inc11

Common questions

Where does Imperial Electric Service Inc install solar?

Its installs are spread across 7 counties. The most are in Fresno County (27 installs), followed by Madera County (4).

How often does Imperial Electric Service Inc install batteries with solar?

20.0% of its interconnected solar installs include battery storage across all years, and 85.7% in the last 24 months (6 of 7).

How many Imperial Electric Service Inc installs are under NEM 3.0 (the Net Billing Tariff)?

7 of its 40 interconnected installs (17.5% of the 40 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 71.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.