KP SOLAR STREAM

How many solar installs has KP SOLAR STREAM done in California, and which license number is on its installs?

KP SOLAR STREAM has 107 residential solar installs interconnected in California, active in the records from 2021 through 2026 (Feb 23, 2021 to Jun 23, 2026), most of them in Los Angeles County (60), San Bernardino County (34) and Orange County (6). The license number recorded on most of its installs, 1034482, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
107
Last 24 months
13
Total capacity
1,069.1 kW DC
Median system size
7.8 kW DC
With battery storage
6.5% all time; 30.8% last 24 months
Third-party owned
0.0% of 107 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
16 installs, latest Jun 23, 2026
Ownership types recorded
none recorded
Median battery size
13.6 kWh (7 installs list a capacity)
First install
Feb 23, 2021
Latest install
Jun 23, 2026
Counties
5
Utilities
SCE 106, PGE 1
CSLB license
1034482

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2021 to 2026

YearInstalls interconnectedWith battery storage
2021120
2022341
2023451
202452
202571
2026 (through Aug 31, 2026)42

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

16 of its 107 interconnected installs (15.0% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The latest Net Billing Tariff install was approved Jun 23, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.09185.0%2 (2.2%)
Net Billing Tariff1615.0%5 (31.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on KP SOLAR STREAM’s installs. No residential system in the file lists a third-party owner name that matches KP SOLAR STREAM exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 13 of KP SOLAR STREAM’s 13 installs name a module maker in the “Generator Manufacturer” fields, and most of those (11, 84.6%) used modules recorded as Znshine.

In the last 24 months, 13 of KP SOLAR STREAM’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (8, 61.5%) used inverters recorded as SolarEdge.

In the last 24 months, 1 of KP SOLAR STREAM’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as SolarEdge.

3 of 7 battery-paired PG&E and SCE installs (42.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerZnshine1151
Foxess33
BP Solar1not in top list
United Renewable Energy1not in top list
VSUN (Vietnam Sunergy)19
Inverter makerSolarEdge842
Foxess33
APsystems (Altenergy Power System)2not in top list
Fronius1not in top list
Battery makerSolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 98 of 107 installs, inverters on 107. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1034482Not found in the CSLB License Master file pulled Nov 4, 2026107

License numbers are the ones the utilities recorded on the interconnection applications (107 of 107 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles60
San Bernardino34
Orange6
Riverside6
Sonoma1

Top cities

CityInstalls
Long Beach24
San Bernardino10
Hesperia6
Victorville5
Fontana4
Lakewood4
Rancho Cucamonga4
Baldwin Park3
La Mirada3
La Puente3
Cypress2
Gardena2
Glendora2
Jurupa Valley2
Norwalk2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
KP SOLAR STREAM107

Common questions

Where does KP SOLAR STREAM install solar?

Its installs are spread across 5 counties. The most are in Los Angeles County (60 installs), followed by San Bernardino County (34).

How often does KP SOLAR STREAM install batteries with solar?

6.5% of its interconnected solar installs include battery storage across all years, and 30.8% in the last 24 months (4 of 13).

How many KP SOLAR STREAM installs are under NEM 3.0 (the Net Billing Tariff)?

16 of its 107 interconnected installs (15.0% of the 107 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 31.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.