Kruetzfeldt Construction Company, Inc. D

How many solar installs has Kruetzfeldt Construction Company, Inc. D done in California, and which license number is on its installs?

Kruetzfeldt Construction Company, Inc. D has 58 residential solar installs interconnected in California, active in the records from 2013 through 2017 (May 20, 2013 to Nov 15, 2017), most of them in Sonoma County (32), Napa County (13) and Marin County (10). CSLB lists license 338647 (SUNTEGRITY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
58
Last 24 months
0
Total capacity
319.5 kW DC
Median system size
5 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
1.7% of 58 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
prepaid lease 1
First install
May 20, 2013
Latest install
Nov 15, 2017
Counties
5
Utilities
PGE 58
CSLB license
338647

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201340
2014260
2015260
201610
201710
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.05798.3%not counted
NEM 2.011.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Kruetzfeldt Construction Company, Inc. D’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 1, other 0. No residential system in the file lists a third-party owner name that matches Kruetzfeldt Construction Company, Inc. D exactly.

Third-party owner named on its installsInstalls
Sunrun, Inc.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 55 of Kruetzfeldt Construction Company, Inc. D’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (26, 47.3%) used modules recorded as LG.

Across all years, 57 of Kruetzfeldt Construction Company, Inc. D’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (35, 61.4%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG026
Qcells017
Kyocera04
SolarWorld04
Yingli03
Inverter makerEnphase035
SMA020
SolarEdge02
Xantrex Technology Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 58 installs, inverters on 57. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
338647SUNTEGRITY SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJul 1, 1977Jul 31, 202853

License numbers are the ones the utilities recorded on the interconnection applications (53 of 58 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 338647. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Kruetzfeldt Construction Company, Inc. D’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated Marin County33864711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma32
Napa13
Marin10
Lake2
Mendocino1

Top cities

CityInstalls
Santa Rosa14
Napa12
Cloverdale5
San Rafael5
Windsor5
Novato3
Sebastopol3
Petaluma2
Sonoma2
Glen Ellen1
Gualala1
Hidden Valley Lake1
Kentfield1
Lakeport1
Larkspur1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Kruetzfeldt Construction Company, Inc. D51
Kruetzfeldt Construction Company, Inc. d7

Common questions

Where does Kruetzfeldt Construction Company, Inc. D install solar?

Its installs are spread across 5 counties. The most are in Sonoma County (32 installs), followed by Napa County (13).

How often does Kruetzfeldt Construction Company, Inc. D install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Kruetzfeldt Construction Company, Inc. D installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 58 interconnected installs with a tariff recorded (58) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.