Kruetzfeldt Construction Co., Inc. dba R

How many solar installs has Kruetzfeldt Construction Co., Inc. dba R done in California, and which license number is on its installs?

Kruetzfeldt Construction Co., Inc. dba R has 403 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Dec 2, 2009 to Oct 18, 2019), most of them in Sonoma County (285), Napa County (69) and Marin County (33). CSLB lists license 338647 (SUNTEGRITY SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Jul 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
403
Last 24 months
0
Total capacity
2,578.4 kW DC
Median system size
5.4 kW DC
With battery storage
0.2% all time; no installs in the last 24 months last 24 months
Third-party owned
2.2% of 403 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 5, prepaid lease 4
First install
Dec 2, 2009
Latest install
Oct 18, 2019
Counties
8
Utilities
PGE 403
CSLB license
338647

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200930
2010130
2011140
2012390
2013530
2014510
2015310
2016680
2017360
2018570
2019381
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 403 interconnected installs with a tariff recorded (403) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.027869.0%not counted
NEM 2.012531.0%1 (0.8%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 9 of Kruetzfeldt Construction Co., Inc. dba R’s installs the utility recorded a third-party ownership type: PPA 5, lease 0, prepaid lease 4, other 0. No residential system in the file lists a third-party owner name that matches Kruetzfeldt Construction Co., Inc. dba R exactly.

Third-party owner named on its installsInstalls
Sunrun, Inc.9

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 390 of Kruetzfeldt Construction Co., Inc. dba R’s 403 installs name a module maker in the “Generator Manufacturer” fields, and most of those (196, 50.3%) used modules recorded as LG.

Across all years, 403 of Kruetzfeldt Construction Co., Inc. dba R’s 403 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (321, 79.7%) used inverters recorded as Enphase.

Across all years, 1 of Kruetzfeldt Construction Co., Inc. dba R’s 403 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as sonnen.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG0196
Qcells056
Suntech044
Yingli020
SolarWorld015
Inverter makerEnphase0321
SMA070
SolarEdge012
SunPower03
Fronius01
Battery makersonnen01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 390 of 403 installs, inverters on 403. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Kruetzfeldt Construction Co., Inc. dba R as developer on 18 battery storage projects and as installer on 3 (3 name it as both), 18 projects in all with 336 kWh of storage. 15 have the status Paid, with $247,505 in current incentive allocations. Applications were received from Mar 1, 2019 to May 28, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid15272$247,505
Cancelled365$64,706

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency16305$305,15013$240,444
Small Residential Storage231$7,0612$7,061

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
338647SUNTEGRITY SOLAR (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorJul 1, 1977Jul 31, 2028250

License numbers are the ones the utilities recorded on the interconnection applications (251 of 403 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 338647. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Kruetzfeldt Construction Co., Inc. dba R’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023Total
unincorporated Marin County33864711

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Sonoma285
Napa69
Marin33
Lake11
Solano2
Butte1
Mendocino1
Tuolumne1

Top cities

CityInstalls
Santa Rosa147
Napa60
Petaluma39
Sebastopol23
Novato22
Sonoma19
Windsor18
Cloverdale11
Rohnert Park9
San Rafael5
Forestville4
American Canyon3
Cotati3
Healdsburg3
Lakeport3

Names as recorded by the utilities

The utilities recorded this installer under 34 spellings. The 25 most common are shown. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Kruetzfeldt Construction Co., Inc. dba R100
Kruetzfeldt Construction Company, Inc.92
Kruetzfeldt Construction Company DBA Solar Universe87
Kruetzfeldt Construction Co, Inc. dba So35
Kruetzfeldt Construction Co, Inc. DBA So18
Kruetzfeldt Construction Co., Inc. DBA R10
Kruetzfeldt Construction Company Inc.7
Kruetzfeldt Construction Co., Inc dba RE6
Kruetzfeldt Construction Co., inc. dba R5
Kruetzfeldt Construction Co Inc dba Sola3
Kruetzfeldt Construction Co., Inc, dba R3
Kruetzfeldt Construction Co., Inc. dba S3
Kruetzfeldt Construction Company3
Kruetzfeldt Construction Company, Inc3
Kruetzfeldt Construction2
Kruetzfeldt Construction Co, Inc dba Sol2
Kruetzfeldt Construction Co, Inc, dba So2
Kruetzfeldt Construction Co, Inc. dba S2
Kruetzfeldt Construction Co.2
Kruetzfeldt Construction Co., Inc.2
Kruetzfeldt Construction dba Solar Unive2
Kruetzfeldt Construction, Co2
Kruetzfeldt Construction co Inc dba Sola1
Kruetzfeldt Construction Co, Inc dba So1
Kruetzfeldt Construction Co, Inc.1

Common questions

Where does Kruetzfeldt Construction Co., Inc. dba R install solar?

Its installs are spread across 8 counties. The most are in Sonoma County (285 installs), followed by Napa County (69).

How often does Kruetzfeldt Construction Co., Inc. dba R install batteries with solar?

0.2% of its interconnected solar installs include battery storage across all years.

How many Kruetzfeldt Construction Co., Inc. dba R installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 403 interconnected installs with a tariff recorded (403) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.