Milton H. Smith Construction

How many solar installs has Milton H. Smith Construction done in California, and which license number is on its installs?

Milton H. Smith Construction has 37 residential solar installs interconnected in California, active in the records from 2004 through 2010 (Feb 13, 2004 to Jan 14, 2010), most of them in Tulare County (35), Fresno County (1) and Kern County (1). The license number recorded on most of its installs, 393824, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
37
Last 24 months
0
Total capacity
283.6 kW DC
Median system size
5.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
2.7% of 37 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
other 1
First install
Feb 13, 2004
Latest install
Jan 14, 2010
Counties
3
Utilities
SCE 28, PGE 9
CSLB license
393824

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200420
200520
200610
200790
2008140
200970
201020
201100
201200
201300
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.037100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Milton H. Smith Construction’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. Across all installers, 1 residential systems list a third-party owner name that matches Milton H. Smith Construction exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Milton H. Smith Construction1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 9 of Milton H. Smith Construction’s 37 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 66.7%) used modules recorded as Sharp.

Across all years, 37 of Milton H. Smith Construction’s 37 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (36, 97.3%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp06
BP Solar01
Kyocera01
SunPower01
Inverter makerSMA036
Advanced Energy, Inc.01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 9 of 37 installs, inverters on 37. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
393824Not found in the CSLB License Master file pulled Nov 4, 202628

License numbers are the ones the utilities recorded on the interconnection applications (28 of 37 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Tulare35
Fresno1
Kern1

Top cities

CityInstalls
Visalia10
Exeter6
Springville3
Dinuba2
Lindsay2
Porterville2
Three Rivers2
Tulare2
Woodlake2
Badger1
Bakersfield1
Cutler1
Kingsburg1
Lemon Cove1
Orosi1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Milton H. Smith Construction34
Milton H Smith Construction2
MILTON H SMITH CONSTRUCTION1

Common questions

Where does Milton H. Smith Construction install solar?

Its installs are spread across 3 counties. The most are in Tulare County (35 installs), followed by Fresno County (1).

How often does Milton H. Smith Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Milton H. Smith Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 37 interconnected installs with a tariff recorded (37) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.