MIRADOR CONSTRUCTION INC

How many solar installs has MIRADOR CONSTRUCTION INC done in California, and which license number is on its installs?

MIRADOR CONSTRUCTION INC has 157 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jun 19, 2018 to Jul 14, 2026), most of them in Solano County (121), Napa County (10) and Contra Costa County (9). CSLB lists license 1038606 (MIRADOR CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
157
Last 24 months
30
Total capacity
1,397.4 kW DC
Median system size
8.2 kW DC
With battery storage
24.8% all time; 93.3% last 24 months
Third-party owned
0.0% of 157 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
30 installs, latest Jul 14, 2026
Ownership types recorded
none recorded
Median battery size
29.5 kWh (30 installs list a capacity)
First install
Jun 19, 2018
Latest install
Jul 14, 2026
Counties
11
Utilities
PGE 157
CSLB license
1038606

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018120
2019192
2020192
2021171
2022240
2023324
202486
20251514
2026 (through Aug 31, 2026)1110

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

30 of its 157 interconnected installs (19.1% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The latest Net Billing Tariff install was approved Jul 14, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.012780.9%11 (8.7%)
Net Billing Tariff3019.1%28 (93.3%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on MIRADOR CONSTRUCTION INC’s installs. No residential system in the file lists a third-party owner name that matches MIRADOR CONSTRUCTION INC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 26 of MIRADOR CONSTRUCTION INC’s 30 installs name a module maker in the “Generator Manufacturer” fields, and most of those (19, 73.1%) used modules recorded as EG4.

In the last 24 months, 30 of MIRADOR CONSTRUCTION INC’s 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (20, 66.7%) used inverters recorded as EG4.

In the last 24 months, 4 of MIRADOR CONSTRUCTION INC’s 30 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used batteries recorded as FranklinWH.

13 of 39 battery-paired PG&E and SCE installs (33.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerEG41919
Axitec1616
Suzhou Talesun Solar Technologies4not in top list
Canadian Solar2not in top list
Qcells223
Inverter makerEG42020
SolarEdge6120
FranklinWH56
Enphase310
APsystems (Altenergy Power System)15
Battery makerFranklinWH34
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 147 of 157 installs, inverters on 157. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names MIRADOR CONSTRUCTION INC as developer on 30 battery storage projects and as installer on 24 (24 name it as both), 30 projects in all with 877 kWh of storage. 16 have the status Paid, with $282,004 in current incentive allocations. Applications were received from Jul 1, 2019 to Dec 23, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid16485$282,004
Reserved9264$113,504
Cancelled5129$26,788

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage16430$58,3439$35,262
Equity Resiliency8287$267,7427$246,742
Large-Scale Storage390$21,3410$0
Residential Solar and Storage Equity - AB 209 Non-POU255$62,5800$0
Non-Residential Storage Equity115$12,2900$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1038606MIRADOR CONSTRUCTION INC (Corporation)CLEARB General Building ContractorApr 26, 2018Jun 30, 2028157

License numbers are the ones the utilities recorded on the interconnection applications (157 of 157 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1038606. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Solano121
Napa10
Contra Costa9
Yolo7
Sonoma3
Santa Clara2
Alameda1
Calaveras1
El Dorado1
Marin1
Placer1

Top cities

CityInstalls
Vacaville50
Fairfield45
Suisun City16
Napa9
Dixon7
Winters4
Davis3
Concord2
Petaluma2
Alamo1
Clayton1
Danville1
El Dorado Hills1
Elmira1
Hercules1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MIRADOR CONSTRUCTION INC121
MIRADOR CONSTRUCTION30
Mirador Construction4
Mirador Construction Inc1
MIRADOR CONSTRUCTION INC.1

Common questions

Where does MIRADOR CONSTRUCTION INC install solar?

Its installs are spread across 11 counties. The most are in Solano County (121 installs), followed by Napa County (10).

How often does MIRADOR CONSTRUCTION INC install batteries with solar?

24.8% of its interconnected solar installs include battery storage across all years, and 93.3% in the last 24 months (28 of 30).

How many MIRADOR CONSTRUCTION INC installs are under NEM 3.0 (the Net Billing Tariff)?

30 of its 157 interconnected installs (19.1% of the 157 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.