MORONGO BASIN SOLAR LLC DBA SOLAR NOW

How many solar installs has MORONGO BASIN SOLAR LLC DBA SOLAR NOW done in California, and which license number is on its installs?

MORONGO BASIN SOLAR LLC DBA SOLAR NOW has 139 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Jul 12, 2022 to Aug 19, 2026), most of them in San Bernardino County (138) and Riverside County (1). CSLB lists license 1084699 (SOLAR NOW) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
139
Last 24 months
52
Total capacity
775.8 kW DC
Median system size
4.8 kW DC
With battery storage
22.3% all time; 55.8% last 24 months
Third-party owned
0.7% of 139 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
77 installs, latest Aug 19, 2026
Ownership types recorded
other 1
Median battery size
15 kWh (31 installs list a capacity)
First install
Jul 12, 2022
Latest install
Aug 19, 2026
Counties
2
Utilities
SCE 139
CSLB license
1084699

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
2022270
2023340
2024408
20252215
2026 (through Aug 31, 2026)168

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

77 of its 139 interconnected installs (55.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 19, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06244.6%3 (4.8%)
Net Billing Tariff7755.4%28 (36.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of MORONGO BASIN SOLAR LLC DBA SOLAR NOW’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches MORONGO BASIN SOLAR LLC DBA SOLAR NOW exactly.

Third-party owner named on its installsInstalls
Frontwave Credit Union1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 52 of MORONGO BASIN SOLAR LLC DBA SOLAR NOW’s 52 installs name a module maker in the “Generator Manufacturer” fields, and most of those (37, 71.2%) used modules recorded as REC.

In the last 24 months, 52 of MORONGO BASIN SOLAR LLC DBA SOLAR NOW’s 52 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (47, 90.4%) used inverters recorded as Enphase.

In the last 24 months, 29 of MORONGO BASIN SOLAR LLC DBA SOLAR NOW’s 52 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (28, 96.6%) used batteries recorded as Enphase.

31 of 31 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC37120
JinkoSolar99
Bluesun Solar11
Canadian Solar1not in top list
Hyundai1not in top list
Inverter makerEnphase47102
SMA34
Sol-Ark1not in top list
SolarEdge119
Battery makerEnphase2830
SolarEdge11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 139 of 139 installs, inverters on 139. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1084699SOLAR NOW (Limited Liability)CLEARC-46 Solar ContractorDec 8, 2021Jun 30, 2028139

License numbers are the ones the utilities recorded on the interconnection applications (139 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1084699. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
San Bernardino138
Riverside1

Top cities

CityInstalls
Yucca Valley49
Joshua Tree47
Twentynine Palms31
Landers5
Pioneertown5
Desert Hot Springs1
Morongo Valley1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
MORONGO BASIN SOLAR LLC DBA SOLAR NOW137
MORONGO BASIN SOLAR LLC2

Common questions

Where does MORONGO BASIN SOLAR LLC DBA SOLAR NOW install solar?

Its installs are spread across 2 counties. The most are in San Bernardino County (138 installs), followed by Riverside County (1).

How often does MORONGO BASIN SOLAR LLC DBA SOLAR NOW install batteries with solar?

22.3% of its interconnected solar installs include battery storage across all years, and 55.8% in the last 24 months (29 of 52).

How many MORONGO BASIN SOLAR LLC DBA SOLAR NOW installs are under NEM 3.0 (the Net Billing Tariff)?

77 of its 139 interconnected installs (55.4% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 36.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.