NEWGEN ENERGY

How many solar installs has NEWGEN ENERGY done in California, and which license number is on its installs?

NEWGEN ENERGY has 115 residential solar installs interconnected in California, active in the records from 2020 through 2025 (Mar 19, 2020 to Jul 9, 2025), most of them in Placer County (62), Merced County (12) and El Dorado County (6). CSLB lists license 1049532 (MARS ENERGY SOLUTIONS) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Jan 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
115
Last 24 months
4
Total capacity
1,188 kW DC
Median system size
8.5 kW DC
With battery storage
0.9% all time; 0.0% last 24 months
Third-party owned
0.0% of 115 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Jul 11, 2024
Ownership types recorded
none recorded
Median battery size
10.5 kWh (1 installs list a capacity)
First install
Mar 19, 2020
Latest install
Jul 9, 2025
Counties
17
Utilities
PGE 115
CSLB license
1049532

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
2020100
2021190
2022160
2023481
2024180
202540
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 115 interconnected installs (9.6% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jul 11, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.010490.4%1 (1.0%)
Net Billing Tariff119.6%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on NEWGEN ENERGY’s installs. No residential system in the file lists a third-party owner name that matches NEWGEN ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of NEWGEN ENERGY’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 75.0%) used modules recorded as Canadian Solar.

In the last 24 months, 4 of NEWGEN ENERGY’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 75.0%) used inverters recorded as Enphase.

In the last 24 months, none of NEWGEN ENERGY’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar340
REC114
Inverter makerEnphase378
SMA117
Battery makerEnphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 100 of 115 installs, inverters on 115. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1049532MARS ENERGY SOLUTIONS (Limited Liability)CLEARB General Building Contractor; C-10 Electrical ContractorJan 29, 2019Jan 31, 2027115

License numbers are the ones the utilities recorded on the interconnection applications (115 of 115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1049532. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer62
Merced12
El Dorado6
Nevada5
San Joaquin5
Contra Costa4
Yolo4
Alameda3
Fresno3
Marin2
Santa Clara2
Solano2
San Luis Obispo1
San Mateo1
Stanislaus1
Sutter1
Yuba1

Top cities

CityInstalls
Loomis27
Rocklin10
Granite Bay8
Lincoln8
Dos Palos4
Gustine4
Davis3
El Dorado Hills3
Grass Valley3
Los Banos3
Manteca3
Penryn3
Auburn2
Fresno2
Los Gatos2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
NEWGEN ENERGY115

Common questions

Where does NEWGEN ENERGY install solar?

Its installs are spread across 17 counties. The most are in Placer County (62 installs), followed by Merced County (12).

How often does NEWGEN ENERGY install batteries with solar?

0.9% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 4).

How many NEWGEN ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 115 interconnected installs (9.6% of the 115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.