Repower Livermore

How many solar installs has Repower Livermore done in California, and which license number is on its installs?

Repower Livermore has 110 residential solar installs interconnected in California, active in the records from 2016 through 2018 (Feb 18, 2016 to Aug 3, 2018), most of them in Alameda County (45), Contra Costa County (33) and San Joaquin County (19). CSLB lists license 941226 (TRUBLUE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
110
Last 24 months
0
Total capacity
721.4 kW DC
Median system size
6.1 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
22.7% of 110 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 5, prepaid lease 20
First install
Feb 18, 2016
Latest install
Aug 3, 2018
Counties
7
Utilities
PGE 110
CSLB license
941226

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016950
2017140
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 110 interconnected installs with a tariff recorded (110) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.09586.4%not counted
NEM 2.01513.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 25 of Repower Livermore’s installs the utility recorded a third-party ownership type: PPA 0, lease 5, prepaid lease 20, other 0. No residential system in the file lists a third-party owner name that matches Repower Livermore exactly.

Third-party owner named on its installsInstalls
Sunrun24
SunPower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 105 of Repower Livermore’s 110 installs name a module maker in the “Generator Manufacturer” fields, and most of those (55, 52.4%) used modules recorded as LG.

Across all years, 110 of Repower Livermore’s 110 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (83, 75.5%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG055
Hyundai023
REC09
SolarWorld09
SunPower03
Inverter makerEnphase083
SMA020
SunPower04
SolarEdge03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 105 of 110 installs, inverters on 110. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941226TRUBLUE (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 21, 2009Dec 31, 2027110

License numbers are the ones the utilities recorded on the interconnection applications (110 of 110 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941226. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Repower Livermore’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco941226729

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda45
Contra Costa33
San Joaquin19
Monterey6
Santa Clara4
Solano2
Merced1

Top cities

CityInstalls
Livermore29
Tracy11
Danville8
Pleasanton7
San Ramon7
Salinas4
Stockton4
Berkeley3
Brentwood3
Concord3
Dublin3
Alamo2
Antioch2
Byron2
King City2

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Repower Livermore95
RePower Livermore15

Common questions

Where does Repower Livermore install solar?

Its installs are spread across 7 counties. The most are in Alameda County (45 installs), followed by Contra Costa County (33).

How often does Repower Livermore install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Repower Livermore installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 110 interconnected installs with a tariff recorded (110) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.