Repower

How many solar installs has Repower done in California, and which license number is on its installs?

Repower has 109 residential solar installs interconnected in California, active in the records from 2016 through 2019 (Jun 28, 2016 to Mar 11, 2019), most of them in Alameda County (38), Contra Costa County (28) and San Joaquin County (19). CSLB lists license 941226 (TRUBLUE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Repower here carry more than one CSLB license number: 941226 on 95 (CSLB holder TRUBLUE, Volcano) and 916006 on 14 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
109
Last 24 months
0
Total capacity
755.3 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
25.7% of 109 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 7, lease 10, prepaid lease 10, other 1
First install
Jun 28, 2016
Latest install
Mar 11, 2019
Counties
15
Utilities
PGE 104, SCE 4, SDGE 1
CSLB license
941226, 916006

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
2016210
2017800
201870
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 109 interconnected installs with a tariff recorded (109) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02119.3%not counted
NEM 2.08880.7%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 28 of Repower’s installs the utility recorded a third-party ownership type: PPA 7, lease 10, prepaid lease 10, other 1. Across all installers, 11 residential systems list a third-party owner name that matches Repower exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun22
SunPower4
Lifestyle1
RePower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 107 of Repower’s 109 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (41, 38.3%) used modules recorded as LG.

Across all years, 109 of Repower’s 109 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (72, 66.1%) used inverters recorded as Enphase.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLG041
Trina Solar022
Hyundai017
SunPower014
SolarWorld09
Inverter makerEnphase072
SolarEdge017
SunPower016
SMA05
Power-One01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 107 of 109 installs, inverters on 109. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
941226TRUBLUE (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorDec 21, 2009Dec 31, 202795
916006Not found in the CSLB License Master file pulled Nov 4, 202614

License numbers are the ones the utilities recorded on the interconnection applications (109 of 109 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 941226. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Repower’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20212022Total
City and County of San Francisco941226729

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Alameda38
Contra Costa28
San Joaquin19
Stanislaus7
Merced3
San Bernardino3
Santa Clara3
Butte1
Calaveras1
El Dorado1
Riverside1
San Diego1
San Francisco1
San Mateo1
Santa Cruz1

Top cities

CityInstalls
Livermore25
Tracy12
Pleasanton8
Riverbank7
Brentwood6
Stockton6
San Ramon5
Antioch4
Pleasant Hill3
San Jose3
Alamo2
Castro Valley2
Concord2
Walnut Creek2
Clayton1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Repower102
RePower6
repower1

Common questions

Where does Repower install solar?

Its installs are spread across 15 counties. The most are in Alameda County (38 installs), followed by Contra Costa County (28).

How often does Repower install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Repower installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 109 interconnected installs with a tariff recorded (109) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.