How many solar installs has RT Maher Construction done in California, and which license number is on its installs?

RT Maher Construction has 91 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Feb 6, 2009 to Apr 29, 2019), most of them in Merced County (74), San Joaquin County (7) and Mariposa County (5). CSLB lists license 503251 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
91
Last 24 months
0
Total capacity
1,033.3 kW DC
Median system size
10.3 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 91 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Feb 6, 2009
Latest install
Apr 29, 2019
Counties
6
Utilities
PGE 91
CSLB license
503251

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
200910
201010
201100
201220
201340
2014340
2015270
201680
201710
2018120
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 91 interconnected installs with a tariff recorded (91) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.07784.6%not counted
NEM 2.01415.4%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on RT Maher Construction’s installs. No residential system in the file lists a third-party owner name that matches RT Maher Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 88 of RT Maher Construction’s 91 installs name a module maker in the “Generator Manufacturer” fields, and most of those (61, 69.3%) used modules recorded as REC.

Across all years, 91 of RT Maher Construction’s 91 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (59, 64.8%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC061
SolarWorld09
Renesola America05
Renesola Jiangsu05
LG04
Inverter makerSMA059
Fronius022
Power-One05
SolarEdge04
Enphase01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 88 of 91 installs, inverters on 91. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
503251Sole owner license (name not shown)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar ContractorDec 24, 1986Nov 30, 202775

License numbers are the ones the utilities recorded on the interconnection applications (75 of 91 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 503251. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Merced74
San Joaquin7
Mariposa5
Stanislaus3
Calaveras1
Fresno1

Top cities

CityInstalls
Merced43
Atwater20
Mariposa4
Tracy4
Winton3
Dos Palos2
Gustine2
Le Grand2
Los Banos2
Vernalis2
Catheys Valley1
Copperopolis1
Fresno1
Manteca1
Oakdale1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
RT MAHER CONSTRUCTION53
RT Maher Construction38

Common questions

Where does RT Maher Construction install solar?

Its installs are spread across 6 counties. The most are in Merced County (74 installs), followed by San Joaquin County (7).

How often does RT Maher Construction install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many RT Maher Construction installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 91 interconnected installs with a tariff recorded (91) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.