SolarCraft

How many solar installs has SolarCraft done in California, and which license number is on its installs?

SolarCraft has 490 residential solar installs interconnected in California, active in the records from 2003 through 2023 (Mar 28, 2003 to Nov 14, 2023), most of them in Marin County (265), Sonoma County (173) and Napa County (39). CSLB lists license 497797 (SOLARCRAFT SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-46, D-35, expires Sep 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
490
Last 24 months
0
Total capacity
3,402.1 kW DC
Median system size
5.6 kW DC
With battery storage
0.4% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 490 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
Median battery size
16 kWh (1 installs list a capacity)
First install
Mar 28, 2003
Latest install
Nov 14, 2023
Counties
8
Utilities
PGE 490
CSLB license
497797

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2003 to 2026

YearInstalls interconnectedWith battery storage
200320
200430
200570
2006150
200770
200810
200910
2010100
201120
2012220
2013530
2014920
2015340
201620
2017380
20181061
2019901
202040
202100
202200
202310
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 490 interconnected installs with a tariff recorded (490) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025652.2%not counted
NEM 2.023447.8%2 (0.9%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SolarCraft’s installs. No residential system in the file lists a third-party owner name that matches SolarCraft exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 477 of SolarCraft’s 490 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (103, 21.6%) used modules recorded as Silfab.

Across all years, 490 of SolarCraft’s 490 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (230, 46.9%) used inverters recorded as Enphase.

0 of 2 battery-paired PG&E and SCE installs (0.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab0103
LG080
Canadian Solar054
SolarWorld050
Renesola Jiangsu043
Inverter makerEnphase0230
SolarEdge0131
SMA066
Power-One034
Fronius027

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 477 of 490 installs, inverters on 490. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SolarCraft as developer on 0 battery storage projects and as installer on 5 (0 name it as both), 5 projects in all with 132 kWh of storage. 1 have the status Paid, with $4,500 in current incentive allocations. Applications were received from May 19, 2023 to Dec 15, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid140$4,500
Cancelled240$28,140
RRF Rejected253$7,440

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage253$6,2401$4,500
Equity Resiliency126$26,4000$0
Not stated253$7,4400$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
497797SOLARCRAFT SERVICES INC (Corporation)CLEARB General Building Contractor; C-10 Electrical Contractor; C-46 Solar Contractor; D-35Sep 4, 1986Sep 30, 2028344

License numbers are the ones the utilities recorded on the interconnection applications (345 of 490 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 497797. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SolarCraft’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
unincorporated Marin County4977973135503313153

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Marin265
Sonoma173
Napa39
Solano7
San Francisco3
Alameda1
Contra Costa1
Tehama1

Top cities

CityInstalls
Novato97
Sonoma63
San Rafael62
Santa Rosa40
Mill Valley24
Petaluma24
Saint Helena17
San Anselmo17
Napa15
Sebastopol12
Larkspur11
Kentfield9
Healdsburg8
Tiburon8
Belvedere7

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SolarCraft443
Solarcraft38
SOLARCRAFT8
solarcraft1

Common questions

Where does SolarCraft install solar?

Its installs are spread across 8 counties. The most are in Marin County (265 installs), followed by Sonoma County (173).

How often does SolarCraft install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years.

How many SolarCraft installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 490 interconnected installs with a tariff recorded (490) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.