Sun America Solar & Construction Co.

How many solar installs has Sun America Solar & Construction Co. done in California, and which license number is on its installs?

Sun America Solar & Construction Co. has 43 residential solar installs interconnected in California, active in the records from 2015 through 2025 (Jun 12, 2015 to Dec 3, 2025), most of them in Solano County (23), Alameda County (6) and Contra Costa County (6). CSLB lists license 597784 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Mar 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
43
Last 24 months
3
Total capacity
247.8 kW DC
Median system size
5.2 kW DC
With battery storage
4.7% all time; 33.3% last 24 months
Third-party owned
2.3% of 43 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Dec 3, 2025
Ownership types recorded
lease 1
Median battery size
11.7 kWh (2 installs list a capacity)
First install
Jun 12, 2015
Latest install
Dec 3, 2025
Counties
9
Utilities
PGE 43
CSLB license
597784

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201580
201650
201730
201890
201930
202070
202121
202220
202310
202400
202531
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 43 interconnected installs (4.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Dec 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01330.2%not counted
NEM 2.02865.1%1 (3.6%)
Net Billing Tariff24.7%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Sun America Solar & Construction Co.’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Sun America Solar & Construction Co. exactly.

Third-party owner named on its installsInstalls
Sunnova Energy Corporation1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of Sun America Solar & Construction Co.’s 3 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (1, 33.3%) used modules recorded as Fortress Power LLC.

In the last 24 months, 3 of Sun America Solar & Construction Co.’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (2, 66.7%) used inverters recorded as Enphase.

In the last 24 months, none of Sun America Solar & Construction Co.’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1 of 2 battery-paired PG&E and SCE installs (50.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerFortress Power LLC1not in top list
Sonali Energees USA LLC1not in top list
SunPower1not in top list
Trina Solar17
Inverter makerEnphase225
Fortress Power LLC11
Battery makerLG01

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 43 of 43 installs, inverters on 43. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
597784Sole owner license (name not shown)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJul 6, 1990Mar 31, 202843

License numbers are the ones the utilities recorded on the interconnection applications (43 of 43 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 597784. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Solano23
Alameda6
Contra Costa6
Kern3
Marin1
Napa1
San Mateo1
Sonoma1
Yolo1

Top cities

CityInstalls
Benicia17
Bakersfield3
Concord3
Oakland3
Vallejo3
Fairfield2
Pleasanton2
Antioch1
Berkeley1
Brisbane1
Davis1
Hercules1
Lafayette1
Napa1
Petaluma1

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Sun America Solar & Construction Co.21
SUN AMERICA SOLAR & CONSTRUCTION CO16
Sun America Solar & Construction2
Sun America Solar & Construction Co2
Sun America Solar & Construction Company2

Common questions

Where does Sun America Solar & Construction Co. install solar?

Its installs are spread across 9 counties. The most are in Solano County (23 installs), followed by Alameda County (6).

How often does Sun America Solar & Construction Co. install batteries with solar?

4.7% of its interconnected solar installs include battery storage across all years, and 33.3% in the last 24 months (1 of 3).

How many Sun America Solar & Construction Co. installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 43 interconnected installs (4.7% of the 43 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.