Tri D Associated Builders Inc

How many solar installs has Tri D Associated Builders Inc done in California, and which license number is on its installs?

Tri D Associated Builders Inc has 94 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Oct 27, 2011 to Apr 9, 2026), most of them in Sutter County (71), Yuba County (9) and Colusa County (8). CSLB lists license 589579 (TRI D ASSOCIATED BUILDERS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
94
Last 24 months
6
Total capacity
828 kW DC
Median system size
7.7 kW DC
With battery storage
0.0% all time; 0.0% last 24 months
Third-party owned
1.1% of 94 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
1 installs, latest Jun 20, 2024
Ownership types recorded
lease 1
First install
Oct 27, 2011
Latest install
Apr 9, 2026
Counties
6
Utilities
PGE 94
CSLB license
589579

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201270
201360
201420
2015310
2016180
201740
201800
201950
202030
202110
202240
202350
202410
202530
2026 (through Aug 31, 2026)30

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

1 of its 94 interconnected installs (1.1% of the 94 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The latest Net Billing Tariff install was approved Jun 20, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06670.2%not counted
NEM 2.02728.7%0 (0.0%)
Net Billing Tariff11.1%0 (0.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of Tri D Associated Builders Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Tri D Associated Builders Inc exactly.

Third-party owner named on its installsInstalls
sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of Tri D Associated Builders Inc’s 6 installs name a module maker in the “Generator Manufacturer” fields, and most of those (5, 83.3%) used modules recorded as CertainTeed.

In the last 24 months, 6 of Tri D Associated Builders Inc’s 6 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2, 33.3%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCertainTeed510
Qcells136
Inverter makerSMA248
SolarEdge236
Tigo Energy, Inc23

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 89 of 94 installs, inverters on 94. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
589579TRI D ASSOCIATED BUILDERS INC (Corporation)CLEARB General Building ContractorMar 5, 1990Apr 30, 202876

License numbers are the ones the utilities recorded on the interconnection applications (77 of 94 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 589579. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Sutter71
Yuba9
Colusa8
Butte4
Placer1
Stanislaus1

Top cities

CityInstalls
Yuba City48
Sutter13
Live Oak9
Colusa8
Marysville7
Gridley2
Oroville2
Lincoln1
Meridian1
Oakdale1
Smartsville1
Wheatland1

Names as recorded by the utilities

The utilities recorded this installer under 10 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
TRI D ASSOCIATED BUILDERS INC37
Tri D Associated Builders Inc20
Tri D Associated Builders, Inc.17
Tri D Associated Builders11
Tri D Associated Builders, Inc4
TRI D Associated Builders Inc1
Tri D Associated Builders Inc.1
Tri D Associated Builders, inc.1
Tri D Associated Builders,Inc1
Tri D Associated Builders., Inc1

Common questions

Where does Tri D Associated Builders Inc install solar?

Its installs are spread across 6 counties. The most are in Sutter County (71 installs), followed by Yuba County (9).

How often does Tri D Associated Builders Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 6).

How many Tri D Associated Builders Inc installs are under NEM 3.0 (the Net Billing Tariff)?

1 of its 94 interconnected installs (1.1% of the 94 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 0.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.