WEBER SOLAR ENERGY

How many solar installs has WEBER SOLAR ENERGY done in California, and which license number is on its installs?

WEBER SOLAR ENERGY has 50 residential solar installs interconnected in California, active in the records from 2022 through 2025 (May 18, 2022 to Sep 30, 2025), most of them in Placer County (25), El Dorado County (13) and Yolo County (6). The license number recorded on most of its installs, 1079343, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
50
Last 24 months
3
Total capacity
402.9 kW DC
Median system size
7.4 kW DC
With battery storage
10.0% all time; 0.0% last 24 months
Third-party owned
0.0% of 50 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Apr 15, 2024
Ownership types recorded
none recorded
Median battery size
28.8 kWh (2 installs list a capacity)
First install
May 18, 2022
Latest install
Sep 30, 2025
Counties
7
Utilities
PGE 50
CSLB license
1079343

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202271
2023373
202451
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 50 interconnected installs (4.0% of the 50 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Apr 15, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04896.0%3 (6.3%)
Net Billing Tariff24.0%2 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on WEBER SOLAR ENERGY’s installs. No residential system in the file lists a third-party owner name that matches WEBER SOLAR ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 3 of WEBER SOLAR ENERGY’s 3 installs name a module maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used modules recorded as Qcells.

In the last 24 months, 3 of WEBER SOLAR ENERGY’s 3 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (3, 100.0%) used inverters recorded as Enphase.

In the last 24 months, none of WEBER SOLAR ENERGY’s 3 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

5 of 5 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells332
Inverter makerEnphase342
Battery makerEnphase03
Stored Energy Inc02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 48 of 50 installs, inverters on 50. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names WEBER SOLAR ENERGY as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 58 kWh of storage. 1 have the status Paid, with $29,118 in current incentive allocations. Applications were received from Oct 10, 2022 to Jan 10, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid129$29,118
Cancelled129$29,118

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency258$58,2361$29,118

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1079343Not found in the CSLB License Master file pulled Nov 4, 202650

License numbers are the ones the utilities recorded on the interconnection applications (50 of 50 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Placer25
El Dorado13
Yolo6
Contra Costa2
Nevada2
Santa Clara1
Sonoma1

Top cities

CityInstalls
Auburn16
Davis6
Mount Aukum6
Lincoln4
Loomis2
Meadow Vista2
Camino1
El Dorado1
Garden Valley1
Greenwood1
Penn Valley1
Petaluma1
Pilot Hill1
Placerville1
Pleasant Hill1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
WEBER SOLAR ENERGY50

Common questions

Where does WEBER SOLAR ENERGY install solar?

Its installs are spread across 7 counties. The most are in Placer County (25 installs), followed by El Dorado County (13).

How often does WEBER SOLAR ENERGY install batteries with solar?

10.0% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 3).

How many WEBER SOLAR ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 50 interconnected installs (4.0% of the 50 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.