Home solar in ZIP code 95236, California

Service city recorded on most installs: Linden. County: San Joaquin County.

How many homes in ZIP code 95236 have solar?

PG&E, SCE and SDG&E interconnected 498 residential solar systems in ZIP code 95236 through Aug 31, 2026, 50 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Linden, San Joaquin County, as the service city on 492 of them. Sunrun has the most installs recorded in this ZIP, 62.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
498
Last 24 months
50 (Sep 2024 through Aug 2026)
Capacity
4,573.1 kW DC
Median system size
8.1 kW DC
Net Billing Tariff (NEM 3.0)
66 installs, 13.3% of those with a tariff recorded
Utility
PGE 498
First install in data
Oct 12, 2004
Latest install in data
Aug 25, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200420
200510
200620
200710
200810
200920
201060
201160
201290
2013120
2014230
2015360
2016350
2017280
2018261
2019371
2020452
2021332
2022571
2023616
20243421
20252421
2026 (through Aug 31, 2026)1716

Battery storage

14.3% of the residential solar installs here include battery storage across all years (71 of 498). In the last 24 months the share was 86.0% (43 of 50).

Net metering tariff

Of the 498 installs with a net metering tariff recorded: NEM 1.0 137 (27.5%), NEM 2.0 295 (59.2%), the Net Billing Tariff (often called NEM 3.0) 66 (13.3%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

21.1% of the 498 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 393 are recorded as not third-party owned. Ownership types recorded: PPA 93, lease 12.

Installers by installs in 95236

Installers with a page in this index, most installs in this ZIP first. 114 such installers have at least one install here. 29 more installs were by 23 installer names without a page in this index. 33 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95236Last 24 months
Sunrun6210
Tesla Energy Operations (formerly SolarCity)460
BTA Solar Electrical Services, Inc380
V3 Electric205
BTA Solar180
SIG SOLAR, S.I.G.143
Infinity Energy, Inc131
Vivint Solar Developer, LLC110
SunPower100
Sunlectric70

City and county recorded for 95236

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Linden492
City: Valley Springs5
County: San Joaquin County478
County: Calaveras County20

1 other city value on 1 install, each under 1% of this ZIP’s installs, are not listed.

Common questions

How common are home batteries with solar in 95236?

14.3% of the residential solar installs here include battery storage across all years (71 of 498). In the last 24 months the share was 86.0% (43 of 50).

How many solar installs in 95236 are under NEM 3.0?

66 of the 498 installs here with a tariff recorded (13.3%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95236?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (62), Tesla Energy Operations (formerly SolarCity) (46), BTA Solar Electrical Services, Inc (38). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.