A-1 Contractors

How many solar installs has A-1 Contractors done in California, and which license number is on its installs?

A-1 Contractors has 129 residential solar installs interconnected in California, active in the records from 2014 through 2021 (Dec 23, 2014 to Mar 25, 2021), most of them in Tulare County (95), Kings County (18) and Fresno County (14). The license number recorded on most of its installs, 992601, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
129
Last 24 months
0
Total capacity
1,132.2 kW DC
Median system size
8.5 kW DC
With battery storage
3.9% all time; no installs in the last 24 months last 24 months
Third-party owned
4.7% of 127 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 5, lease 1
Median battery size
9.8 kWh (5 installs list a capacity)
First install
Dec 23, 2014
Latest install
Mar 25, 2021
Counties
5
Utilities
SCE 99, PGE 30
CSLB license
992601

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201420
201570
201680
2017281
2018251
2019330
2020221
202142
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 129 interconnected installs with a tariff recorded (129) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02821.7%not counted
NEM 2.010178.3%5 (5.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 6 of A-1 Contractors’s installs the utility recorded a third-party ownership type: PPA 5, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches A-1 Contractors exactly.

Third-party owner named on its installsInstalls
Sunedison4
Jose garcia1
Sunnova1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 127 of A-1 Contractors’ 129 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (46, 36.2%) used modules recorded as Panasonic.

Across all years, 129 of A-1 Contractors’ 129 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (65, 50.4%) used inverters recorded as SolarEdge.

Across all years, 2 of A-1 Contractors’ 129 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as LG.

2 of 5 battery-paired PG&E and SCE installs (40.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic046
JA Solar037
LG010
SolarWorld06
Sun Edison06
Inverter makerSolarEdge065
Enphase044
SMA014
ABB02
Fronius01
Battery makerLG02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 127 of 129 installs, inverters on 129. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names A-1 Contractors as developer on 14 battery storage projects and as installer on 13 (13 name it as both), 14 projects in all with 150 kWh of storage. 3 have the status Paid, with $8,454 in current incentive allocations. Applications were received from Dec 4, 2017 to Dec 15, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid325$8,454
Cancelled11125$22,451

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage11110$25,7863$8,454
Large-Scale Storage339$5,1190$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992601Not found in the CSLB License Master file pulled Nov 4, 2026121

License numbers are the ones the utilities recorded on the interconnection applications (122 of 129 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Tulare95
Kings18
Fresno14
Madera1
San Joaquin1

Top cities

CityInstalls
Visalia53
Tulare12
Hanford9
Exeter8
Fresno7
Porterville6
Lemoore4
Springville3
Woodlake3
Avenal2
Corcoran2
Dinuba2
Farmersville2
Lindsay2
Reedley2

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A - 1 CONTRACTORS INC68
A-1 Contractors31
A-1 Contractors Inc.26
A-1 CONTRACTORS INC2
A-1 contractors.co1
A-1 Contractors.co1

Common questions

Where does A-1 Contractors install solar?

Its installs are spread across 5 counties. The most are in Tulare County (95 installs), followed by Kings County (18).

How often does A-1 Contractors install batteries with solar?

3.9% of its interconnected solar installs include battery storage across all years.

How many A-1 Contractors installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 129 interconnected installs with a tariff recorded (129) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.