How many solar installs has A - 1 ELECTRIC done in California, and which license number is on its installs?

A - 1 ELECTRIC has 130 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 12, 2013 to Feb 13, 2026), most of them in Tulare County (100), Kings County (18) and Fresno County (9). The license number recorded on most of its installs, 992601, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
130
Last 24 months
10
Total capacity
1,324.4 kW DC
Median system size
9.6 kW DC
With battery storage
12.3% all time; 50.0% last 24 months
Third-party owned
0.8% of 127 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Feb 13, 2026
Ownership types recorded
PPA 1
Median battery size
13.6 kWh (15 installs list a capacity)
First install
Sep 12, 2013
Latest install
Feb 13, 2026
Counties
5
Utilities
SCE 107, PGE 23
CSLB license
992601

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201420
201500
201600
201700
201800
201900
202060
2021261
2022350
2023322
20242311
202541
2026 (through Aug 31, 2026)11

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 130 interconnected installs (11.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Feb 13, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.032.3%not counted
NEM 2.011286.2%6 (5.4%)
Net Billing Tariff1511.5%10 (66.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 1 of A - 1 ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches A - 1 ELECTRIC exactly.

Third-party owner named on its installsInstalls
Empower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 10 of A - 1 ELECTRIC’s 10 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 40.0%) used modules recorded as JA Solar.

In the last 24 months, 10 of A - 1 ELECTRIC’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of A - 1 ELECTRIC’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Enphase.

12 of 16 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar439
Qcells36
Aptos Solar114
EG 4 Electronics1not in top list
EG41not in top list
Inverter makerEnphase652
EG42not in top list
GoodWe Technologies Co., Ltd.14
Tesla16
Battery makerEnphase27
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 119 of 130 installs, inverters on 130. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992601Not found in the CSLB License Master file pulled Nov 4, 2026127

License numbers are the ones the utilities recorded on the interconnection applications (127 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Tulare100
Kings18
Fresno9
Kern2
San Luis Obispo1

Top cities

CityInstalls
Visalia59
Tulare19
Hanford12
Porterville7
Dinuba4
Lemoore4
Three Rivers3
Woodlake3
Exeter2
Fresno2
Kingsburg2
Riverdale2
Arroyo Grande1
Avenal1
Bakersfield1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A - 1 ELECTRIC127
A-1 ELECTRIC3

Common questions

Where does A - 1 ELECTRIC install solar?

Its installs are spread across 5 counties. The most are in Tulare County (100 installs), followed by Kings County (18).

How often does A - 1 ELECTRIC install batteries with solar?

12.3% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (5 of 10).

How many A - 1 ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 130 interconnected installs (11.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.