A - 1 ELECTRIC
How many solar installs has A - 1 ELECTRIC done in California, and which license number is on its installs?
A - 1 ELECTRIC has 130 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Sep 12, 2013 to Feb 13, 2026), most of them in Tulare County (100), Kings County (18) and Fresno County (9). The license number recorded on most of its installs, 992601, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 130
- Last 24 months
- 10
- Total capacity
- 1,324.4 kW DC
- Median system size
- 9.6 kW DC
- With battery storage
- 12.3% all time; 50.0% last 24 months
- Third-party owned
- 0.8% of 127 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 15 installs, latest Feb 13, 2026
- Ownership types recorded
- PPA 1
- Median battery size
- 13.6 kWh (15 installs list a capacity)
- First install
- Sep 12, 2013
- Latest install
- Feb 13, 2026
- Counties
- 5
- Utilities
- SCE 107, PGE 23
- CSLB license
- 992601
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2013 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2013 | 1 | 0 |
| 2014 | 2 | 0 |
| 2015 | 0 | 0 |
| 2016 | 0 | 0 |
| 2017 | 0 | 0 |
| 2018 | 0 | 0 |
| 2019 | 0 | 0 |
| 2020 | 6 | 0 |
| 2021 | 26 | 1 |
| 2022 | 35 | 0 |
| 2023 | 32 | 2 |
| 2024 | 23 | 11 |
| 2025 | 4 | 1 |
| 2026 (through Aug 31, 2026) | 1 | 1 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
15 of its 130 interconnected installs (11.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The latest Net Billing Tariff install was approved Feb 13, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 3 | 2.3% | not counted |
| NEM 2.0 | 112 | 86.2% | 6 (5.4%) |
| Net Billing Tariff | 15 | 11.5% | 10 (66.7%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 1 of A - 1 ELECTRIC’s installs the utility recorded a third-party ownership type: PPA 1, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches A - 1 ELECTRIC exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| Empower | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 10 of A - 1 ELECTRIC’s 10 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (4, 40.0%) used modules recorded as JA Solar.
In the last 24 months, 10 of A - 1 ELECTRIC’s 10 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6, 60.0%) used inverters recorded as Enphase.
In the last 24 months, 3 of A - 1 ELECTRIC’s 10 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 66.7%) used batteries recorded as Enphase.
12 of 16 battery-paired PG&E and SCE installs (75.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | JA Solar | 4 | 39 |
| Qcells | 3 | 6 | |
| Aptos Solar | 1 | 14 | |
| EG 4 Electronics | 1 | not in top list | |
| EG4 | 1 | not in top list | |
| Inverter maker | Enphase | 6 | 52 |
| EG4 | 2 | not in top list | |
| GoodWe Technologies Co., Ltd. | 1 | 4 | |
| Tesla | 1 | 6 | |
| Battery maker | Enphase | 2 | 7 |
| Tesla | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 119 of 130 installs, inverters on 130. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 992601 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 127 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (127 of 130 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- A-1 Contractors: 129 installs, license 992601
Counties
| County | Installs |
|---|---|
| Tulare | 100 |
| Kings | 18 |
| Fresno | 9 |
| Kern | 2 |
| San Luis Obispo | 1 |
Top cities
| City | Installs |
|---|---|
| Visalia | 59 |
| Tulare | 19 |
| Hanford | 12 |
| Porterville | 7 |
| Dinuba | 4 |
| Lemoore | 4 |
| Three Rivers | 3 |
| Woodlake | 3 |
| Exeter | 2 |
| Fresno | 2 |
| Kingsburg | 2 |
| Riverdale | 2 |
| Arroyo Grande | 1 |
| Avenal | 1 |
| Bakersfield | 1 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| A - 1 ELECTRIC | 127 |
| A-1 ELECTRIC | 3 |
Common questions
Where does A - 1 ELECTRIC install solar?
Its installs are spread across 5 counties. The most are in Tulare County (100 installs), followed by Kings County (18).
How often does A - 1 ELECTRIC install batteries with solar?
12.3% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (5 of 10).
How many A - 1 ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?
15 of its 130 interconnected installs (11.5% of the 130 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.