How many solar installs has AAA Steiner's Solar Service done in California, and which license number is on its installs?

AAA Steiner's Solar Service has 42 residential solar installs interconnected in California, active in the records from 2010 through 2019 (Jul 23, 2010 to Sep 27, 2019), most of them in El Dorado County (14), Placer County (14) and Yolo County (8). CSLB lists license 887507 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Nov 30, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
42
Last 24 months
0
Total capacity
293.9 kW DC
Median system size
6.7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 42 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Jul 23, 2010
Latest install
Sep 27, 2019
Counties
4
Utilities
PGE 42
CSLB license
887507

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201100
201200
201340
201450
201570
201660
201750
201880
201960
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.02354.8%not counted
NEM 2.01945.2%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AAA Steiner's Solar Service’s installs. No residential system in the file lists a third-party owner name that matches AAA Steiner's Solar Service exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 42 of AAA Steiner's Solar Service’s 42 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (17, 40.5%) used modules recorded as Qcells.

Across all years, 42 of AAA Steiner's Solar Service’s 42 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (37, 88.1%) used inverters recorded as SolarEdge.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells017
Canadian Solar014
LG08
SolarWorld02
Sharp01
Inverter makerSolarEdge037
SMA03
Enphase02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 42 of 42 installs, inverters on 42. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
887507Sole owner license (name not shown)CLEARC-10 Electrical Contractor; C-46 Solar ContractorNov 21, 2006Nov 30, 202634

License numbers are the ones the utilities recorded on the interconnection applications (38 of 42 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 887507. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
El Dorado14
Placer14
Yolo8
Solano6

Top cities

CityInstalls
El Dorado Hills8
Rocklin7
Cameron Park4
West Sacramento4
Davis3
Dixon3
Granite Bay3
Vacaville3
Lincoln2
Auburn1
Cool1
Placerville1
Weimar1
Woodland1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AAA STEINER'S SOLAR SERVICE26
AAA Steiner's Solar Service16

Common questions

Where does AAA Steiner's Solar Service install solar?

Its installs are spread across 4 counties. The most are in El Dorado County (14 installs), followed by Placer County (14).

How often does AAA Steiner's Solar Service install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many AAA Steiner's Solar Service installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 42 interconnected installs with a tariff recorded (42) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.