ABC Solar Incorporated

How many solar installs has ABC Solar Incorporated done in California, and which license number is on its installs?

ABC Solar Incorporated has 408 residential solar installs interconnected in California, active in the records from 2002 through 2026 (May 9, 2002 to Aug 31, 2026), most of them in Los Angeles County (390), Orange County (11) and Napa County (1). CSLB lists license 914346 (ABC SOLAR INCORPORATED) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
408
Last 24 months
60
Total capacity
2,859.4 kW DC
Median system size
6.3 kW DC
With battery storage
27.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 85.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.5% of 385 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
53 installs, latest Aug 31, 2026
Ownership types recorded
lease 2
Median battery size
20 kWh (110 installs list a capacity)
First install
May 9, 2002
Latest install
Aug 31, 2026
Counties
9
Utilities
SCE 403, PGE 3, SDGE 2
CSLB license
914346

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2002 to 2026

YearInstalls interconnectedWith battery storage
200210
200300
200400
200520
200610
200720
200820
2009130
2010110
2011150
2012100
201380
2014130
2015190
2016260
2017243
2018202
2019181
2020166
2021263
20224821
20235014
20242810
20253834
2026 (through Aug 31, 2026)1716

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

53 of its 408 interconnected installs (13.0% of the 408 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.014234.8%not counted
NEM 2.021352.2%62 (29.4%)
Net Billing Tariff5313.0%46 (86.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 2 of ABC Solar Incorporated’s installs the utility recorded a third-party ownership type: PPA 0, lease 2, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches ABC Solar Incorporated exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
sun power solar program 1, LLC1
SunPower SolarProgram I, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 60 of ABC Solar Incorporated’s 60 installs name a module maker in the “Generator Manufacturer” fields, and most of those (40, 66.7%) used modules recorded as Briggs & Stratton, LLC.

In the last 24 months, 60 of ABC Solar Incorporated’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (40, 66.7%) used inverters recorded as Sol-Ark.

In the last 24 months, 8 of ABC Solar Incorporated’s 60 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (4, 50.0%) used batteries recorded as EcoFlow.

20 of 110 battery-paired PG&E and SCE installs (18.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerBriggs & Stratton, LLC4040
Silfab38129
JA Solar10not in top list
Panasonic732
Mission Solar2not in top list
Inverter makerSol-Ark4040
Enphase9132
EcoFlow4not in top list
Fortress Power LLC4not in top list
FortressPower1not in top list
Battery makerEcoFlow44
Fortress Power LLC22
FortressPower22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 318 of 408 installs, inverters on 408. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ABC Solar Incorporated as developer on 0 battery storage projects and as installer on 25 (0 name it as both), 25 projects in all with 674 kWh of storage. 5 have the status Paid, with $16,788 in current incentive allocations. Applications were received from May 1, 2017 to Feb 16, 2018.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid535$16,788
Cancelled9248$118,654
RRF Rejected11391$188,708

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage1088$37,6665$16,788
Large-Scale Storage4196$97,7760$0
Not stated11391$188,7080$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
914346ABC SOLAR INCORPORATED (Corporation)CLEARB General Building Contractor; C-46 Solar ContractorApr 19, 2008Apr 30, 2028407

License numbers are the ones the utilities recorded on the interconnection applications (407 of 408 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 914346. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles390
Orange11
Napa1
Riverside1
San Bernardino1
San Diego1
San Mateo1
Santa Cruz1
Ventura1

Top cities

CityInstalls
Rancho Palos Verdes92
Torrance64
Palos Verdes Estates48
Redondo Beach37
Manhattan Beach31
Rolling Hills Estates20
Rolling Hills17
Long Beach11
Palos Verdes Peninsula10
Hermosa Beach9
El Segundo7
Bell Gardens4
Lomita4
Malibu4
Glendora3

Names as recorded by the utilities

The utilities recorded this installer under 8 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ABC SOLAR INCORPORATED270
ABC SOLAR INC64
ABC Solar Incorporated49
ABC SOLAR14
abc solar, inc4
abc solar3
ABC SOLAR INC.3
ABC Solar, Inc.1

Common questions

Where does ABC Solar Incorporated install solar?

Its installs are spread across 9 counties. The most are in Los Angeles County (390 installs), followed by Orange County (11).

How often does ABC Solar Incorporated install batteries with solar?

27.1% of its interconnected solar installs include battery storage across all years, and 85.0% in the last 24 months (51 of 60). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many ABC Solar Incorporated installs are under NEM 3.0 (the Net Billing Tariff)?

53 of its 408 interconnected installs (13.0% of the 408 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.