AFFORDABLE SOLAR ENERGY

How many solar installs has AFFORDABLE SOLAR ENERGY done in California, and which license number is on its installs?

AFFORDABLE SOLAR ENERGY has 119 residential solar installs interconnected in California, active in the records from 2020 through 2025 (Mar 25, 2020 to Sep 3, 2025), most of them in Tehama County (105), Shasta County (10) and Butte County (3). CSLB lists license 1025246 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
119
Last 24 months
4
Total capacity
1,174.3 kW DC
Median system size
9.7 kW DC
With battery storage
3.4% all time; 50.0% last 24 months
Third-party owned
0.0% of 119 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
8 installs, latest Nov 21, 2024
Ownership types recorded
none recorded
First install
Mar 25, 2020
Latest install
Sep 3, 2025
Counties
4
Utilities
PGE 119
CSLB license
1025246

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202050
202180
2022410
2023500
2024144
202510
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

8 of its 119 interconnected installs (6.7% of the 119 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Nov 21, 2024.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.011193.3%0 (0.0%)
Net Billing Tariff86.7%4 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on AFFORDABLE SOLAR ENERGY’s installs. No residential system in the file lists a third-party owner name that matches AFFORDABLE SOLAR ENERGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 4 of AFFORDABLE SOLAR ENERGY’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (4, 100.0%) used modules recorded as Qcells.

In the last 24 months, 4 of AFFORDABLE SOLAR ENERGY’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 2 of AFFORDABLE SOLAR ENERGY’s 4 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

4 of 4 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells482
Inverter makerEnphase4119
Battery makerEnphase24

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 117 of 119 installs, inverters on 119. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names AFFORDABLE SOLAR ENERGY as developer on 3 battery storage projects and as installer on 2 (2 name it as both), 3 projects in all with 71 kWh of storage. 2 have the status Paid, with $29,775 in current incentive allocations. Applications were received from Apr 12, 2024 to May 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid230$29,775
Reserved141$7,344

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency230$29,7752$29,775
Large-Scale Storage141$7,3440$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1025246Sole owner license (name not shown)CLEARC-10 Electrical ContractorMar 28, 2017Mar 31, 2027118

License numbers are the ones the utilities recorded on the interconnection applications (118 of 119 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1025246. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tehama105
Shasta10
Butte3
Glenn1

Top cities

CityInstalls
Red Bluff78
Cottonwood12
Corning7
Los Molinos6
Anderson4
Vina4
Gerber2
Chico1
Durham1
Orland1
Oroville1
Proberta1
Redding1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
AFFORDABLE SOLAR ENERGY113
Affordable Solar Energy6

Common questions

Where does AFFORDABLE SOLAR ENERGY install solar?

Its installs are spread across 4 counties. The most are in Tehama County (105 installs), followed by Shasta County (10).

How often does AFFORDABLE SOLAR ENERGY install batteries with solar?

3.4% of its interconnected solar installs include battery storage across all years, and 50.0% in the last 24 months (2 of 4).

How many AFFORDABLE SOLAR ENERGY installs are under NEM 3.0 (the Net Billing Tariff)?

8 of its 119 interconnected installs (6.7% of the 119 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.