ALL TERRAIN SOLAR ELECTRIC

How many solar installs has ALL TERRAIN SOLAR ELECTRIC done in California, and which license number is on its installs?

ALL TERRAIN SOLAR ELECTRIC has 75 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Mar 2, 2018 to Jun 16, 2026), most of them in Santa Barbara County (67) and Ventura County (8). The license number recorded on most of its installs, 1025866, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. CSLB lists license 1111062 (ALL TERRAIN SOLAR ELECTRIC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Oct 31, 2027, recorded on 19 of its installs.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to ALL TERRAIN SOLAR ELECTRIC here carry more than one CSLB license number: 1025866 on 56 (not found in the CSLB License Master file) and 1111062 on 19 (CSLB holder ALL TERRAIN SOLAR ELECTRIC, Santa Barbara), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
75
Last 24 months
24
Total capacity
535.6 kW DC
Median system size
6.8 kW DC
With battery storage
26.7% all time; 75.0% last 24 months
Third-party owned
0.0% of 75 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
12 installs, latest May 8, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (20 installs list a capacity)
First install
Mar 2, 2018
Latest install
Jun 16, 2026
Counties
2
Utilities
SCE 74, PGE 1
CSLB license
1025866, 1111062

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201840
2019121
202060
202130
2022151
202360
202450
2025109
2026 (through Aug 31, 2026)149

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

12 of its 75 interconnected installs (16.0% of the 75 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The latest Net Billing Tariff install was approved May 8, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.06384.0%9 (14.3%)
Net Billing Tariff1216.0%11 (91.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ALL TERRAIN SOLAR ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches ALL TERRAIN SOLAR ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of ALL TERRAIN SOLAR ELECTRIC’s 24 installs name a module maker in the “Generator Manufacturer” fields, and most of those (18, 75.0%) used modules recorded as Qcells.

In the last 24 months, 24 of ALL TERRAIN SOLAR ELECTRIC’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (13, 54.2%) used inverters recorded as SolarEdge.

In the last 24 months, 18 of ALL TERRAIN SOLAR ELECTRIC’s 24 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (18, 100.0%) used batteries recorded as Tesla.

20 of 20 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1824
Panasonic236
REC27
Kyocera11
SolarWorld1not in top list
Inverter makerSolarEdge1346
Tesla99
ABB1not in top list
SMA15
Battery makerTesla1819

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 72 of 75 installs, inverters on 75. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1025866Not found in the CSLB License Master file pulled Nov 4, 202656
1111062ALL TERRAIN SOLAR ELECTRIC (Corporation)CLEARC-10 Electrical ContractorOct 6, 2023Oct 31, 202719

License numbers are the ones the utilities recorded on the interconnection applications (75 of 75 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1111062. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Barbara67
Ventura8

Top cities

CityInstalls
Santa Barbara54
Goleta9
Ventura7
Carpinteria3
Oak Park1
Solvang1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ALL TERRAIN SOLAR ELECTRIC75

Common questions

Where does ALL TERRAIN SOLAR ELECTRIC install solar?

Its installs are spread across 2 counties. The most are in Santa Barbara County (67 installs), followed by Ventura County (8).

How often does ALL TERRAIN SOLAR ELECTRIC install batteries with solar?

26.7% of its interconnected solar installs include battery storage across all years, and 75.0% in the last 24 months (18 of 24).

How many ALL TERRAIN SOLAR ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

12 of its 75 interconnected installs (16.0% of the 75 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.