Allen Energy

How many solar installs has Allen Energy done in California, and which license number is on its installs?

Allen Energy has 88 residential solar installs interconnected in California, active in the records from 2014 through 2019 (Aug 19, 2014 to Jul 16, 2019), most of them in Santa Barbara County (66) and Ventura County (22). CSLB lists license 503300 (ALLEN CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2026.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
88
Last 24 months
0
Total capacity
488.1 kW DC
Median system size
4.7 kW DC
With battery storage
12.5% all time; no installs in the last 24 months last 24 months
Third-party owned
4.5% of 66 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 3
Median battery size
13.5 kWh (11 installs list a capacity)
First install
Aug 19, 2014
Latest install
Jul 16, 2019
Counties
2
Utilities
SCE 82, PGE 6
CSLB license
503300

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2014 to 2026

YearInstalls interconnectedWith battery storage
201490
2015411
2016151
2017163
201866
201910
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.08495.5%not counted
NEM 2.044.5%2 (50.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 3 of Allen Energy’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches Allen Energy exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunpower2
Allen Energy1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 66 of Allen Energy’s 88 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (30, 45.5%) used modules recorded as SunPower.

Across all years, 88 of Allen Energy’s 88 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (32, 36.4%) used inverters recorded as SMA.

Across all years, 10 of Allen Energy’s 88 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (8, 80.0%) used batteries recorded as Tesla.

10 of 11 battery-paired PG&E and SCE installs (90.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower030
SolarWorld015
REC011
LG08
OutBack Power01
Inverter makerSMA032
SolarEdge027
Enphase023
SunPower04
ABB01
Battery makerTesla08
sonnen02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 66 of 88 installs, inverters on 88. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Allen Energy as developer on 0 battery storage projects and as installer on 10 (0 name it as both), 10 projects in all with 170 kWh of storage. 8 have the status Paid, with $60,751 in current incentive allocations. Applications were received from May 1, 2017 to Sep 5, 2017.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid8142$60,751
Cancelled228$12,040

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage10170$72,7918$60,751

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
503300ALLEN CONSTRUCTION (Corporation)CLEARB General Building ContractorDec 29, 1986Dec 31, 202679

License numbers are the ones the utilities recorded on the interconnection applications (80 of 88 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 503300. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Barbara66
Ventura22

Top cities

CityInstalls
Santa Barbara50
Ventura15
Goleta7
Ojai4
Oak View3
Solvang3
Carpinteria2
Los Alamos1
Santa Maria1
Santa Ynez1
Summerland1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Allen Energy65
ALLEN ENERGY23

Common questions

Where does Allen Energy install solar?

Its installs are spread across 2 counties. The most are in Santa Barbara County (66 installs), followed by Ventura County (22).

How often does Allen Energy install batteries with solar?

12.5% of its interconnected solar installs include battery storage across all years.

How many Allen Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 88 interconnected installs with a tariff recorded (88) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.