ARROW ENERGY SOLAR SYSTEMS

How many solar installs has ARROW ENERGY SOLAR SYSTEMS done in California, and which license number is on its installs?

ARROW ENERGY SOLAR SYSTEMS has 124 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Jul 24, 2018 to Aug 4, 2026), most of them in Santa Cruz County (99), Santa Clara County (21) and Monterey County (2). CSLB lists license 1040832 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
124
Last 24 months
29
Total capacity
835.1 kW DC
Median system size
6.3 kW DC
With battery storage
21.8% all time; 44.8% last 24 months
Third-party owned
0.0% of 124 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
9 installs, latest Aug 4, 2026
Ownership types recorded
none recorded
First install
Jul 24, 2018
Latest install
Aug 4, 2026
Counties
5
Utilities
PGE 124
CSLB license
1040832

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
201830
2019100
2020100
2021130
2022135
2023235
2024255
20251910
2026 (through Aug 31, 2026)82

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

9 of its 124 interconnected installs (7.3% of the 124 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.8%not counted
NEM 2.011491.9%18 (15.8%)
Net Billing Tariff97.3%9 (100.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ARROW ENERGY SOLAR SYSTEMS’s installs. No residential system in the file lists a third-party owner name that matches ARROW ENERGY SOLAR SYSTEMS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 26 of ARROW ENERGY SOLAR SYSTEMS’ 29 installs name a module maker in the “Generator Manufacturer” fields, and most of those (14, 53.8%) used modules recorded as Qcells.

In the last 24 months, 29 of ARROW ENERGY SOLAR SYSTEMS’ 29 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (27, 93.1%) used inverters recorded as Enphase.

In the last 24 months, 13 of ARROW ENERGY SOLAR SYSTEMS’ 29 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (12, 92.3%) used batteries recorded as Enphase.

26 of 27 battery-paired PG&E and SCE installs (96.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells1459
REC1020
JinkoSolar17
SunPower1not in top list
Inverter makerEnphase27122
SMA23
Sol-Ark11
SolarEdge12
Tesla1not in top list
Battery makerEnphase1225
Tesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 118 of 124 installs, inverters on 124. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ARROW ENERGY SOLAR SYSTEMS as developer on 0 battery storage projects and as installer on 2 (0 name it as both), 2 projects in all with 49 kWh of storage. 1 have the status Paid, with $9,706 in current incentive allocations. Applications were received from Aug 30, 2022 to May 11, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid110$9,706
Cancelled139$6,988

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency110$9,7061$9,706
Large-Scale Storage139$6,9880$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1040832Sole owner license (name not shown)CLEAR, WC Susp PendingC-46 Solar ContractorJun 18, 2018Jun 30, 2028123

License numbers are the ones the utilities recorded on the interconnection applications (123 of 124 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1040832. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Santa Cruz99
Santa Clara21
Monterey2
Marin1
Tuolumne1

Top cities

CityInstalls
Aptos34
Santa Cruz32
Watsonville22
San Jose15
Scotts Valley4
Soquel4
Capitola3
Los Altos3
Boulder Creek1
Campbell1
Fairfax1
Groveland1
Los Gatos1
Royal Oaks1
Sunnyvale1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ARROW ENERGY SOLAR SYSTEMS115
Arrow Energy Solar Systems9

Common questions

Where does ARROW ENERGY SOLAR SYSTEMS install solar?

Its installs are spread across 5 counties. The most are in Santa Cruz County (99 installs), followed by Santa Clara County (21).

How often does ARROW ENERGY SOLAR SYSTEMS install batteries with solar?

21.8% of its interconnected solar installs include battery storage across all years, and 44.8% in the last 24 months (13 of 29).

How many ARROW ENERGY SOLAR SYSTEMS installs are under NEM 3.0 (the Net Billing Tariff)?

9 of its 124 interconnected installs (7.3% of the 124 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.