B S W ROOFING AND SOLAR

How many solar installs has B S W ROOFING AND SOLAR done in California, and which license number is on its installs?

B S W ROOFING AND SOLAR has 139 residential solar installs interconnected in California, active in the records from 2013 through 2026 (Mar 14, 2013 to Jul 29, 2026), most of them in Kern County (138) and Tulare County (1). CSLB lists license 828481 (B S W ROOFING AND SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-39, C-46, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
139
Last 24 months
13
Total capacity
1,319 kW DC
Median system size
9.3 kW DC
With battery storage
5.8% all time; 53.8% last 24 months
Third-party owned
0.0% of 139 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
15 installs, latest Jul 29, 2026
Ownership types recorded
none recorded
First install
Mar 14, 2013
Latest install
Jul 29, 2026
Counties
2
Utilities
PGE 135, SCE 4
CSLB license
828481

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2013 to 2026

YearInstalls interconnectedWith battery storage
201310
201400
201500
201600
201700
201800
201900
202000
2021210
2022520
2023480
202441
2025117
2026 (through Aug 31, 2026)20

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

15 of its 139 interconnected installs (10.8% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.7% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.7%not counted
NEM 2.012388.5%1 (0.8%)
Net Billing Tariff1510.8%7 (46.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on B S W ROOFING AND SOLAR’s installs. No residential system in the file lists a third-party owner name that matches B S W ROOFING AND SOLAR exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 12 of B S W ROOFING AND SOLAR’s 13 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 50.0%) used modules recorded as REC.

In the last 24 months, 13 of B S W ROOFING AND SOLAR’s 13 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (12, 92.3%) used inverters recorded as Enphase.

In the last 24 months, 7 of B S W ROOFING AND SOLAR’s 13 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7, 100.0%) used batteries recorded as Enphase.

8 of 8 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC6116
Hyundai44
Canadian Solar22
Qcells11
Inverter makerEnphase12136
SolarEdge13
Battery makerEnphase78

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 124 of 139 installs, inverters on 139. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
828481B S W ROOFING AND SOLAR (Corporation)CLEARB General Building Contractor; C-39 Roofing Contractor; C-46 Solar ContractorDec 16, 2003Dec 31, 2027138

License numbers are the ones the utilities recorded on the interconnection applications (138 of 139 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 828481. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Kern138
Tulare1

Top cities

CityInstalls
Bakersfield133
Tehachapi2
Pixley1
Ridgecrest1
Shafter1
Taft1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
B S W ROOFING AND SOLAR138
B S W ROOFING and Solar1

Common questions

Where does B S W ROOFING AND SOLAR install solar?

Its installs are spread across 2 counties. The most are in Kern County (138 installs), followed by Tulare County (1).

How often does B S W ROOFING AND SOLAR install batteries with solar?

5.8% of its interconnected solar installs include battery storage across all years, and 53.8% in the last 24 months (7 of 13).

How many B S W ROOFING AND SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

15 of its 139 interconnected installs (10.8% of the 139 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.