CONNECTED TECHNOLOGY

How many solar installs has CONNECTED TECHNOLOGY done in California, and which license number is on its installs?

CONNECTED TECHNOLOGY has 237 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Jan 18, 2019 to Aug 5, 2026), most of them in Placer County (164), El Dorado County (39) and Yolo County (15). CSLB lists license 996560 (CONNECTED TECHNOLOGY) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-7, C-10, C-20, expires Mar 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
237
Last 24 months
108
Total capacity
2,031.3 kW DC
Median system size
7.8 kW DC
With battery storage
50.6% all time; 86.1% last 24 months
Third-party owned
0.0% of 237 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
97 installs, latest May 4, 2026
Ownership types recorded
none recorded
Median battery size
27 kWh (61 installs list a capacity)
First install
Jan 18, 2019
Latest install
Aug 5, 2026
Counties
8
Utilities
PGE 237
CSLB license
996560

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201930
202010
202130
2022314
20237210
20244132
20256456
2026 (through Aug 31, 2026)2218

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

97 of its 237 interconnected installs (40.9% of the 237 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The latest Net Billing Tariff install was approved May 4, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0156.3%not counted
NEM 2.012552.7%22 (17.6%)
Net Billing Tariff9740.9%87 (89.7%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CONNECTED TECHNOLOGY’s installs. No residential system in the file lists a third-party owner name that matches CONNECTED TECHNOLOGY exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 90 of CONNECTED TECHNOLOGY’s 108 installs name a module maker in the “Generator Manufacturer” fields, and most of those (48, 53.3%) used modules recorded as REC.

In the last 24 months, 108 of CONNECTED TECHNOLOGY’s 108 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (72, 66.7%) used inverters recorded as Tesla.

In the last 24 months, 76 of CONNECTED TECHNOLOGY’s 108 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (57, 75.0%) used batteries recorded as Tesla.

95 of 120 battery-paired PG&E and SCE installs (79.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC4863
Panasonic2095
JA Solar99
Mission Solar99
SunPower4not in top list
Inverter makerTesla7285
Enphase46172
SolarEdge812
SMA712
SunPower58
Battery makerTesla5759
Enphase1735
Schneider Electric22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 184 of 237 installs, inverters on 237. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CONNECTED TECHNOLOGY as developer on 38 battery storage projects and as installer on 33 (33 name it as both), 38 projects in all with 765 kWh of storage. 21 have the status Paid, with $238,295 in current incentive allocations. Applications were received from Jan 7, 2022 to Jan 23, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid21400$238,295
Reserved6143$96,009
Pending Reservation240$61,485
Cancelled9183$127,279

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage17250$35,57612$23,589
Equity Resiliency16409$399,4988$205,000
Residential Solar and Storage Equity - AB 209 Non-POU349$71,8170$0
Large-Scale Storage258$16,1761$9,706

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
996560CONNECTED TECHNOLOGY (Corporation)CLEARC-7; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning ContractorSep 10, 2014Mar 31, 2027237

License numbers are the ones the utilities recorded on the interconnection applications (237 of 237 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 996560. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Placer164
El Dorado39
Yolo15
Nevada11
Sutter5
Alameda1
Calaveras1
Contra Costa1

Top cities

CityInstalls
Rocklin68
Lincoln38
El Dorado Hills25
Granite Bay22
Auburn18
Davis9
Loomis8
Yuba City5
Cameron Park4
Nevada City4
Newcastle4
Penryn4
West Sacramento4
Cool3
Grass Valley3

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CONNECTED TECHNOLOGY234
Connected Technology3

Common questions

Where does CONNECTED TECHNOLOGY install solar?

Its installs are spread across 8 counties. The most are in Placer County (164 installs), followed by El Dorado County (39).

How often does CONNECTED TECHNOLOGY install batteries with solar?

50.6% of its interconnected solar installs include battery storage across all years, and 86.1% in the last 24 months (93 of 108).

How many CONNECTED TECHNOLOGY installs are under NEM 3.0 (the Net Billing Tariff)?

97 of its 237 interconnected installs (40.9% of the 237 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.