Danlin Corporation

How many solar installs has Danlin Corporation done in California, and which license number is on its installs?

Danlin Corporation has 82 residential solar installs interconnected in California, active in the records from 2010 through 2026 (Jan 26, 2010 to Mar 24, 2026), most of them in San Francisco County (69), Sonoma County (6) and Marin County (4). CSLB lists license 552769 (DANLIN CORPORATION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-33, C-46, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
82
Last 24 months
11
Total capacity
270.6 kW DC
Median system size
1.1 kW DC
With battery storage
1.2% all time; 9.1% last 24 months
Third-party owned
2.4% of 82 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
2 installs, latest Feb 11, 2026
Ownership types recorded
other 2
Median battery size
11 kWh (1 installs list a capacity)
First install
Jan 26, 2010
Latest install
Mar 24, 2026
Counties
6
Utilities
PGE 82
CSLB license
552769

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
2010320
201100
2012250
201340
201400
201500
201600
201740
201810
201920
202000
202110
202200
202310
202430
202540
2026 (through Aug 31, 2026)51

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

2 of its 82 interconnected installs (2.4% of the 82 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The latest Net Billing Tariff install was approved Feb 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06174.4%not counted
NEM 2.01923.2%0 (0.0%)
Net Billing Tariff22.4%1 (50.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 2 of Danlin Corporation’s installs the utility recorded a third-party ownership type: PPA 0, lease 0, prepaid lease 0, other 2. Across all installers, 2 residential systems list a third-party owner name that matches Danlin Corporation exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Danlin Corporation2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 11 of Danlin Corporation’s 11 installs name a module maker in the “Generator Manufacturer” fields, and most of those (8, 72.7%) used modules recorded as Qcells.

In the last 24 months, 11 of Danlin Corporation’s 11 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (4, 36.4%) used inverters recorded as Enphase.

In the last 24 months, 1 of Danlin Corporation’s 11 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as Tesla.

1 of 1 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells811
LONGi2not in top list
Kyocera1not in top list
Sanyo1not in top list
Inverter makerEnphase460
SolarEdge35
Tigo Energy, Inc2not in top list
APsystems (Altenergy Power System)1not in top list
Tesla1not in top list
Battery makerTesla11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 82 of 82 installs, inverters on 82. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Danlin Corporation as developer on 0 battery storage projects and as installer on 14 (0 name it as both), 14 projects in all with 1,508 kWh of storage. 2 have the status Paid, with $118,944 in current incentive allocations. Applications were received from Oct 29, 2012 to Sep 15, 2023.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid299$118,944
Reserved1353$141,151
Cancelled111,056$935,022

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Large-Scale Storage1353$141,1510$0
Not stated131,155$1,053,9662$118,944

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
552769DANLIN CORPORATION (Corporation)CLEARB General Building Contractor; C-33; C-46 Solar ContractorJan 5, 1989May 31, 202721

License numbers are the ones the utilities recorded on the interconnection applications (21 of 82 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 552769. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Danlin Corporation’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920232026Total
City and County of San Francisco55276920114
unincorporated Marin County55276902002

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Francisco69
Sonoma6
Marin4
Santa Clara1
Santa Cruz1
Yuba1

Top cities

CityInstalls
San Francisco69
Santa Rosa4
San Rafael3
Boulder Creek1
Calistoga1
Los Altos1
Novato1
Sebastopol1
Smartsville1

Names as recorded by the utilities

The utilities recorded this installer under 3 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Danlin Corporation65
DANLIN CORPORATION14
Danlin Corp3

Common questions

Where does Danlin Corporation install solar?

Its installs are spread across 6 counties. The most are in San Francisco County (69 installs), followed by Sonoma County (6).

How often does Danlin Corporation install batteries with solar?

1.2% of its interconnected solar installs include battery storage across all years, and 9.1% in the last 24 months (1 of 11).

How many Danlin Corporation installs are under NEM 3.0 (the Net Billing Tariff)?

2 of its 82 interconnected installs (2.4% of the 82 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 50.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.